Laserfiche WebLink
ATTY/RESO.0114/PC RESO CERTIFYING FINAL EIR – 557 E. BAYSHORE ROAD <br />REV: 12-09-22 VR <br />Page 30 of 61 <br />Mitigation Monitoring or Reporting Program <br />557 East Bayshore Road Project (SCH #2017072047) <br />Impacts Mitigation Timeframe for <br />Implementation <br />Responsibility <br />for <br />Implementatio <br />n <br />Oversight of <br />Implementatio <br />n <br />Air Quality <br />Impact AIR-2: The <br />project would not <br />result in a <br />cumulatively <br />considerable net <br />increase of any <br />criteria pollutant for <br />which the project <br />region is non- <br />attainment under <br />an applicable <br />federal or state <br />ambient air quality <br />standard. <br /> <br />Less than <br />Significant Impact <br />with Mitigation <br />Incorporated <br />MM AIR-2.1: During any construction period ground <br />disturbance, the applicant shall ensure that the project <br />contractor implements the following standard BAAQMD <br />BMPs: <br /> All exposed surfaces (e.g., parking areas, staging <br />areas, soil piles, graded areas, and unpaved <br />access roads) shall be watered two times per day. <br /> All haul trucks transporting soil, sand, or other <br />loose material off-site shall be covered. <br /> All visible mud or dirt track-out onto adjacent <br />public roads shall be removed using wet power <br />vacuum street sweepers at least once per day. <br />The use of dry power sweeping is prohibited. <br /> All vehicle speeds on unpaved roads shall be <br />limited to 15 miles per hour (mph). <br /> All roadways, driveways, and sidewalks to be <br />paved shall be completed as soon as possible. <br />Building pads shall be laid as soon as possible <br />after grading unless seeding or soil binders are <br />used. <br /> Idling times shall be minimized either by shutting <br />equipment off when not in use or reducing the <br />maximum idling time to five minutes (as required <br />by the California airborne toxics control measure <br />During any <br />construction period <br />ground disturbance <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project <br />applicant and <br />contractors <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Director of the <br />Community <br />Development <br />and <br />Transportation <br />Department <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />