Laserfiche WebLink
ATTY/RESO.0114/PC RESO CERTIFYING FINAL EIR – 557 E. BAYSHORE ROAD <br />REV: 12-09-22 VR <br />Page 32 of 61 <br />Mitigation Monitoring or Reporting Program <br />557 East Bayshore Road Project (SCH #2017072047) <br />Impacts Mitigation Timeframe for <br />Implementation <br />Responsibility <br />for <br />Implementatio <br />n <br />Oversight of <br />Implementatio <br />n <br /> If use of Tier 4 equipment is not available, <br />alternatively use equipment that meets U.S. EPA <br />emission standards for Tier 3 engines and include <br />particulate matter emissions control equivalent to <br />CARB Level 3 verifiable diesel emission control <br />devices that altogether achieve a 70 percent <br />reduction in particulate matter exhaust in <br />comparison to uncontrolled equipment; <br />alternatively (or in combination). <br /> Use of electrical or non-diesel fueled equipment. <br /> <br />Alternatively, the applicant may develop another <br />construction operations plan demonstrating that the <br />construction equipment used on-site would achieve a <br />reduction in construction diesel particulate matter <br />emissions by 70 percent or greater across all construction <br />phases. Elements of the plan could include a combination <br />of some of the following measures: <br /> Use Tier 4 or alternatively fueled equipment, <br /> Installation of electric power lines during early <br />construction phases to avoid use of diesel <br />generators and compressors, <br /> Use of electrically-powered equipment, <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />