Laserfiche WebLink
ATTY/RESO.0114/PC RESO CERTIFYING FINAL EIR – 557 E. BAYSHORE ROAD <br />REV: 12-09-22 VR <br />Page 33 of 61 <br />Mitigation Monitoring or Reporting Program <br />557 East Bayshore Road Project (SCH #2017072047) <br />Impacts Mitigation Timeframe for <br />Implementation <br />Responsibility <br />for <br />Implementatio <br />n <br />Oversight of <br />Implementatio <br />n <br /> Forklifts and aerial lifts used for exterior and <br />interior building construction shall be electric or <br />propane/natural gas powered, <br /> Change in construction build-out plans to lengthen <br />phases, and <br /> Implementation of different building techniques <br />that result in less diesel equipment usage. <br /> <br />Such an alternative construction operations shall be <br />prepared by an air quality professional and submitted to <br />the Community Development and Transportation <br />Department for review and approval prior to issuance of <br />grading permits. <br />Impact AIR-3: The <br />Project would not <br />expose sensitive <br />receptors to <br />substantial <br />pollutant <br />concentrations with <br />mitigation <br />incorporated. <br /> <br />Less than <br />See MM AIR-2.1 and MM AIR-2.2 above Same as MM AIR-2.1 <br />and MM AIR-2.2 <br />above <br />Same as MM <br />AIR-2.1 and <br />MM AIR-2.2 <br />above <br />Same as MM <br />AIR-2.1 and <br />MM AIR-2.2 <br />above