Laserfiche WebLink
ATTY/RESO.0114/PC RESO CERTIFYING FINAL EIR – 557 E. BAYSHORE ROAD <br />REV: 12-09-22 VR <br />Page 47 of 61 <br />Mitigation Monitoring or Reporting Program <br />557 East Bayshore Road Project (SCH #2017072047) <br />Impacts Mitigation Timeframe for <br />Implementation <br />Responsibility <br />for <br />Implementatio <br />n <br />Oversight of <br />Implementatio <br />n <br />harvest mice and salt marsh wandering shrews, to <br />escape the project impact area under the cover of <br />vegetation, and will encourage movement of such small <br />mammals towards available vegetated habitat to the <br />north outside the project site. All herbaceous vegetation <br />that could potentially conceal a salt marsh harvest mouse <br />or salt marsh wandering shrew within the project impact <br />area shall be removed. All vegetation that is removed <br />shall be hauled off-site the day it is removed, and shall <br />not be left on the site to provide potential cover for small <br />mammal species. <br /> <br />MM BIO-1.14: Exclusion Barrier. The area of vegetation <br />removal shall extend to the boundary of the work area <br />(i.e., the edge of ruderal ditch bank grassland habitat) <br />along the muted tidal drainage ditch, and shall not extend <br />into the marsh vegetation. After removal of the vegetation <br />and prior to the start of construction activities below top of <br />bank, a barrier shall be installed at the easternmost, <br />westernmost, and northernmost limits of the work area <br />below the top of bank within the muted tidal drainage <br />ditch to exclude salt marsh harvest mice and salt marsh <br />wandering shrews from the project site. This barrier, <br />which shall be shown on the project plans and shall be <br />constructed under the guidance of a qualified biologist, <br />was removed shall <br />be completed prior to <br />construction access, <br />and the installation of <br />the barrier shall be <br />monitored. Following <br />the installation of the <br />barrier, designated <br />construction <br />personnel shall check <br />its integrity each <br />morning that <br />construction activities <br />occur, and shall <br />initiate repairs <br />immediately as <br />needed. <br /> <br /> <br />During construction <br />activities <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project <br />applicant <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Director of the <br />Community <br />Development <br />and <br />Transportation <br />Department <br /> <br /> <br />