Laserfiche WebLink
ATTY/RESO.0115/PC RESO APPROVING PROJECT WITH DRAFT CONDITIONS OF APPROVAL - 557 E. BAYSHORE ROAD <br />REV: 12-21-2022 VR <br />Page 11 of 26 <br />14. Blomquist Bridge – The applicant shall contribute its fair share for the cost of analysis, <br />design, construction, of the Blomquist Bridge over Redwood Creek in accordance with the East <br />101 Fair share Infrastructure Area. The estimated cost in 2015 dollars is $8,680 per equivalent <br />transportation dwelling unit (EDUt). The contribution is estimated at $4,626,440.00. <br />[COA][ENGINEERING] <br /> <br />15. Water Main underneath Blomquist Bridge – The applicant shall contribute its fair share <br />for the cost of analysis, design, construction, of the 20” water main underneath Blomquist Bridge, <br />approximately 500 LF, in accordance with the East 101 Fair share Infrastructure Area. The <br />estimated cost in 2015 dollars is $132 per equivalent water dwelling unit (EDUw). The <br />contribution is estimated at $87,912.00. [COA][ENGINEERING] <br /> <br />16. Water Main from Blomquist Bridge to Seaport Boulevard – The applicant shall contribute <br />its fair share for the cost of analysis, design, construction of the 20” water main from Blomquist <br />Bridge to Seaport Boulevard, in accordance with the East 101 Fair share Infrastructure Area. The <br />estimated cost in 2015 dollars is $444 per equivalent water dwelling unit (EDUw). The <br />contribution is estimated at $295,704.00. [COA][ENGINEERING] <br /> <br />17. Water Main on East Bayshore Boulevard – The applicant shall contribute its fair share for <br />the cost of analysis, design, construction of the 12” (inner diameter) water main on East Bayshore <br />Boulevard, approximately 1700 LF, in accordance with the East 101 Fair share Infrastructure Area. <br />The estimated cost in 2015 dollars is $1,018 per equivalent water dwelling unit (EDUw). The <br />contribution is estimated at $677,988.00. [COA][ENGINEERING] <br /> <br />18. Sewer Main on East Bayshore Boulevard – The applicant shall contribute its fair share for <br />the cost of analysis, design, construction of the 15” sewer main on East Bayshore Boulevard, <br />approximately 1700 LF, in accordance with the East 101 Fair share Infrastructure Area. The <br />estimated cost in 2015 dollars is $813 per equivalent sewer dwelling unit (EDUs). The contribution <br />is estimated at $406,500.00. [COA][ENGINEERING] <br />19. Roadway Reconstruction of E Bayshore Boulevard - The applicant shall contribute its fair <br />share for the cost of analysis, design, construction of the reconstruction of E Bayshore Boulevard <br />from Whipple to Blomquist Bridge, approximately 1,800 linear feet, in accordance with the East <br />101 Fair share Infrastructure Area. The estimated cost in 2015 dollars is $187 per equivalent <br />transportation dwelling unit (EDUt). The contribution is estimated at $99,671.00. <br />[COA][ENGINEERING] <br /> <br />20. Roadway Reconstruction of Blomquist Street – The applicant shall contribute its fair <br />share for the cost of analysis, design, construction of the reconstruction of Blomquist Street from <br />Maple Street East to Seaport Boulevard, approximately 1,720 linear feet, in accordance with the <br />East 101 Fair share Infrastructure Area. The estimated cost in 2015 dollars is $227 per equivalent <br />transportation dwelling unit (EDUt). The contribution is estimated at $120,991.00. <br />[COA][ENGINEERING]