My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 RKH -
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Under 60k
>
Agmt09 RKH -
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2009 9:30:36 AM
Creation date
11/18/2009 9:30:35 AM
Metadata
Fields
Template:
Agreement
Contractor Name
RKH
PROJECT NAME
Traffic Engineering Services
Date
11/16/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Mi Rancho Supermarket, Redwood City <br />Proposal for Traffic Engineering Services <br /> <br />B. Proposed Mi Rancho Market, 150 Charter Street <br />1. Intersection traffic count at the intersection of EI Camino Real & Charter Street <br />Pedestrians and bicycles will be included in the intersection counts. <br /> <br />2. 24-hr. directional machine counts including speed: <br />a. Charter Street between EI Camino Real and Hancock Street <br />b. Hancock Street between Charter Street and Willow Street <br />c. Willow Street between Hancock Street and Shasta Street <br /> <br />NOTE: Traffic data collection will depend on availability of good weather conditions. <br />Traffic data will not be collected between November 23 and November 30,2009, and <br />between December 21, 2009, and January 4, 20 I 0 because of the holidays. <br /> <br />Task 2 - Draft Report <br /> <br />A. Existing Conditions <br /> <br />RKH will creat a traffic model of the study area streets and intersection using the TRAFFIX <br />program.) Levels of service (LOS) during the peak hour as listed in Task I.A. will be <br />calculated for the designated study area intersection following the procedures in the <br />Highway Capacity Manua1.2 A queue analysis will also be made for the controlled <br />movements at the intersection. <br /> <br />B. Project Conditions <br /> <br />1. Project Trip Generation. Using the data collected in Task I.A. RKH will project <br />vehicle trip generation during the peak hour for the new store on Charter Street. <br />Daily traffic volumes will also be estimated using data in Trip Generation 3 for <br />supermarkets (land use code 850). <br /> <br />2 <br /> <br />1 Dowling Associates, Version 8.0, Release 1, 11/23/08 @ 2008 <br /> <br />2 Transportation Research Board, @ 2000 <br /> <br />3 Institute of Transportation Engineers, 8th Edition, @ 2008. <br /> <br />~.w.J.I. <br />
The URL can be used to link to this page
Your browser does not support the video tag.