My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 Escartiz Studio
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Agmt23 Escartiz Studio
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2024 1:04:29 PM
Creation date
9/27/2024 1:04:04 PM
Metadata
Fields
Template:
Agreement
RMP File Number
304
Date
11/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 10-05-23 VR <br />Deliverables: <br />1. Submit and present the working mockup of resin clad structure per the approved plan. <br />2. Provide a preliminary review of structural systems, lighting, and electrical systems. <br />3. Site visit for field observations and measurements, if necessary. <br />Meetings: <br />• Present mock-up at on-site or virtual meetings as needed. <br />Subtask 1.3: Final Clad Design & Final Mockup <br />Upon completion of the conceptual design Artist will prepare a final design to share with <br />design team and general contractor. <br />Deliverables: <br />1. Present final design and mock-up at on-site or virtual meeting to design team. <br />2. Coordinate any modifications required for construction drawings with design team. <br />3. Submit final mockup. <br />4. Review construction drawings and specifications for notes to be added to construction <br />documents regarding clad work and coordination with general contractor. <br />Meetings: <br />• Attend on-site and virtual meetings as needed. <br />Task 2: Art Installation at the Park <br />Subtask 2.1: Review Final Design with the General Contractor and Construction <br />Team <br />The Artist will present the mockup and final design with the design team and the <br />construction team, and explain the cladding installation process to team. <br />Meetings: <br />• Attend on-site and virtual meetings as needed. <br />Subtask 2.2: Complete Art Installation <br />Art installation will focus on the offsite fabrication of the resin clad structure. The Artist <br />shall install the cladding for cupola, roof panels, siding and columns of the metal structure, <br />and all seams to build a waterproof cover. <br />The art is completed when the resin-mix clad entirely covers the metal structure and <br />conforms to the artist’s rendering and/or illustration in scale, color and finishes as <br />approved by Arts Commission. <br />Deliverables: <br />1. Off-site fabrication of art necessary for art installation <br />2. Delivery of all materials and parts necessary for art installation to the site <br />3. Complete art installation at the site <br />4. Field adjust resin clad panels for seamless, waterproof structure, if necessary. <br />ATTY/AGR.2023.245/Escartiz Studio (Jardin de Ninos Park Expansion Art Installation) (Page 14 of 15)
The URL can be used to link to this page
Your browser does not support the video tag.