Laserfiche WebLink
REV: 10-04-24 VR <br />Fees <br />Consultant shall be paid on a time and material basis the hourly fee identified below for all tasks <br />listed in the scope of work except the topographic and boundary survey: <br />Role/Tile Hourly Fee <br />Principal-in-Charge, Mowery $395.02 <br />Senior Professional II/QC $367.35 <br />Public Outreach Coordinator $343.93 <br />Project Manager, Hoac $286.73 <br />Lead Task Engineer $206.58 <br />Sr. Professional Engineer I $249.01 <br />Engineer Analyst II $184.99 <br />Engineer Analyst I $174.07 <br />Project Support Staff $151.77 <br />Consultant shall be paid the fixed fee identified below upon City’s acceptance of the Topographic <br />and Boundary Survey: <br />Topographic and Boundary <br />Survey <br />$53,100 <br />ATTY/AGR.2024.181/KImley-Horn (Roosevelt Ave Permanent Traffic Calming Project De (Page 19 of 42) <br />6.B. - Page 23 of 46 <br />48