Laserfiche WebLink
REV: 10-04-24 VR <br />Survey: <br />»Traffic Control will not be required for survey field work <br />»Record of Survey is not required for this project <br />Additional Services: <br />»Significant repaving is not anticipated as part of this scope of work, but rather slurry seal <br />or grind/overlay treatment. <br />»Traffic signal design will not be required. <br />»Additional traffic study will not be required. <br />»No Caltrans permitting will be required. The project does not scope any disturbance to El <br />Camino Real or work within the Caltrans ROW. <br />»Project Storm Water Pollution Prevention Plan (SWPPP) is not anticipated or required. <br />»Lighting analysis will not be required at any project locations. Existing luminaires will be <br />reinstalled in any location where they are affected. <br />»No pedestrian Rectangular Rapid Flashing Beacon (RRFB) installation are assumed. <br />»Geotechnical services are included as optional for Pavement Section recommendations. <br />ATTY/AGR.2024.181/KImley-Horn (Roosevelt Ave Permanent Traffic Calming Project De (Page 18 of 42) <br />6.B. - Page 22 of 46 <br />47