REV: 10-04-24 VR <br />Task 10 – As-Built Drawings <br />Upon completion of construction, Consultant shall prepare a record drawing(s) showing changes <br />reported by the Contractor or made to the design by the Consultant. The Record Drawings shall <br />be based upon red-lines provided by the contractor and field reviews, using AutoCAD. Final <br />Record Drawings shall be submitted electronically, in PDF and CAD format. The version of CAD <br />files shall be coordinated with City staff. <br />General Notes on the Project Scope: <br />»Improvements along the Roosevelt corridor is based on the quick-build design, the scope <br />of the project is for intersection bulb-outs along the corridor. At this point, there is an intent <br />to improve ten (10) intersections with bulb-outs and pedestrian crossing facilities for ADA <br />compliance as shown in the quick-build plans. Other intersections, including curb ramps, <br />along Roosevelt within this corridor are not anticipated to be disturbed unless the quick- <br />build evaluation suggests differently. Minimal modifications to the implemented quick build <br />plans is assumed. <br />»This project will not significantly alter existing drainage patterns. The element/treatment <br />used for improvements will include cut-outs to maintain drainage or new catch basins with <br />underground piping connecting to existing flow lines and inlets. As such, design of <br />drainage infrastructure will be minimal. <br />»The roadway resurfacing work between El Camino Real and Hudson Street will be a <br />combination of slurry seal, mill and overlay and base repair / full depth replacement with <br />areas indicated by City staff. Four (4) curb ramps will need to be updated as part of this <br />scope of work due to the limits of pavement, if more than this is required or requested then <br />separate scope and fee will be requested. <br />»Improvements for this project will not trigger Regional Quality Control Board MRP 3.0 <br />Stormwater based on the latest C.3 requirements. This includes the traffic calming <br />improvements as well as the roadway resurfacing, should the overall area of disturbance <br />exceed threshold for Roadway Reconstruction Projects (1 acre), separate scope and fee <br />will be requested. <br />»It is anticipated that apart from Stormwater improvements, minimal impacts to other <br />existing utilities as part of this scope of work. Water, wastewater and dry utility design or <br />coordination is not anticipated to be required as part of this project. <br />»Storm Drain or any Utility profiling is not anticipated as part of this scope of work. <br />»Any curb ramp, roadway or curb radii profiles is not anticipated as part of the improvement <br />package. <br />»City will lead coordination with SamTrans, Fire Department and other authorities having <br />jurisdiction <br />»It is assumed that tree removal will be coordinated by the City with the City Arborist if <br />necessary. <br />ATTY/AGR.2024.181/KImley-Horn (Roosevelt Ave Permanent Traffic Calming Project De (Page 17 of 42) <br />6.B. - Page 21 of 46 <br />46