Laserfiche WebLink
REV: 09-04-24 LF <br />EXHIBIT “A” <br />SCOPE OF SERVICES AND FEE <br />Scope of Services <br />Consultant will provide the following services for the City’s Hoover Park project: <br />Task 1 – Geotechnical Exploration <br />Field Exploration <br />Four borings to depths of up to approximately 20 feet below existing grade with a truck- <br />mounted drill rig. As required by the California Geological Survey – Note 48, conduct a <br />minimum of two exploration locations within the envelope of the proposed building. <br />Perform one additional seismic CPT sounding to a depth of approximately 50 feet below <br />grade within the proposed restroom/concession building footprint. Consultant’s <br />representative will observe the drilling operations and log the subsurface conditions <br />encountered. Soil samples will be taken at frequent intervals for visual classification and <br />laboratory testing. <br />Laboratory Testing <br />Test representative soil samples from the exploratory locations in a laboratory to <br />determine some of their engineering properties. Examine moisture content, dry density, <br />plasticity index, sieve analysis, unconfined compression, triaxial, and corrosivity testing <br />(pH, resistivity, chloride, and sulfate) as needed, for this project. <br />Geotechnical Reporting <br />Analyze the subsurface conditions and laboratory test results and prepare a geotechnical <br />report that will include the items described below. <br />1. Suitability of the property for the proposed parks and recreation development <br />2. Site seismicity and seismic hazards <br />3. Discussion of treatment of geotechnical constraints such as loose/soft surface <br />soil, existing fill, compressible soil, expansive soil, and liquefiable soil, as <br />necessary, based on field exploration results <br />4. Estimated total and differential foundation settlements due to liquefaction <br />5. Earthwork <br />• Site clearing and original ground preparation <br />• Existing fill removal (if any) <br />• Treatment of over-optimum soil moisture conditions <br />• Acceptable on-site and imported fill materials <br />• Subgrade and fill compaction requirements <br />• Utility trench backfill compaction <br />• Fill construction on slopes <br />• Surface drainage <br />6. Current Building Code Seismic Parameters <br />7. Foundation Recommendations for the Various Proposed Structures <br />• Minimum dimensions <br />ATTY/AGR.2024.153/ENGEO Incoporated (Hoover Park Geotechinical) (Page 11 of 13)