My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt24 Engeo Incorporated
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2024
>
Under $106K
>
Agmt24 Engeo Incorporated
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2024 4:43:51 PM
Creation date
10/18/2024 4:43:47 PM
Metadata
Fields
Template:
Agreement
Contractor Name
geotechnical engineer for City’s Hoover Park project.
RMP File Number
304.5
Date
10/2/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 09-04-24 LF <br />• Maximum allowable bearing capacity <br />• Allowable lateral passive earth pressure and coefficient of sliding friction <br />8. Fitness/Sport Court Recommendations <br />9. Concrete Slabs-on-Grade <br />• Minimum design thickness and reinforcement <br />• Slab moisture vapor reduction <br />10.Pavements <br />• Asphalt concrete <br />The report will contain discussions of site-specific soil and groundwater conditions, <br />laboratory test data, boring log data, CPT log data, and a site plan showing City’s <br />exploratory locations and improvement limits. The report will include a geologic and <br />seismic hazards (Geohazards) discussion based on the requirements of the current <br />version of the California Geological Survey – Note 48 (Checklist for the Review of <br />Engineering Geology and Seismology Reports for California Public Schools, Hospitals, <br />and Essential Services Buildings). <br />To comply with the requirements of Note 48, Consultant will perform the following for the <br />site. <br />1. Review pertinent geologic maps, seismic hazard maps, and geologic reports, and <br />include the <br />following items. <br />a. A regional geologic map <br />b. A regional fault map <br />c. A site geologic map <br />d. Geologic cross sections <br />2. Perform a probabilistic seismic hazard analysis to develop appropriate peak <br />ground acceleration and spectral acceleration curves. <br />3. Review the potential for: <br />a. Liquefaction <br />b. Seismically induced settlements <br />c. Lateral ground movement <br />d. Subsidence <br />e. Subsurface gases <br />f. Naturally occurring asbestos <br />g. Volcanic eruption <br />h. Tsunami <br />Report must be signed by a licensed California Geotechnical Engineer and a Certified <br />Engineering Geologist. <br />Assist the City in connection with the City’s responsibility for filing documents required for <br />the approval of governmental authorities having jurisdiction over the project. <br />Project scope includes up to two rounds of Department of State Architects (DSA) <br />revisions to the report to assist the City with securing building permits. <br />ATTY/AGR.2024.153/ENGEO Incoporated (Hoover Park Geotechinical) (Page 12 of 13)
The URL can be used to link to this page
Your browser does not support the video tag.