My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09.05.2023 Reso 0091 PC23-20 PC Reso 800 Main Hotel Sequoia
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2023
>
09.05.2023 Reso 0091 PC23-20 PC Reso 800 Main Hotel Sequoia
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 2:45:44 PM
Creation date
10/21/2024 2:45:35 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 2:45 PM
Modified:
10/21/2024 2:45 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH35TRPR_S35.3PERECURETR
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 2:45 PM
Modified:
10/21/2024 2:45 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.241STIMTRTR
ID:
3
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 2:45 PM
Modified:
10/21/2024 2:45 PM
Text:
http://www.redwoodcity.org/home/showdocument?id=1952
ID:
4
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 2:45 PM
Modified:
10/21/2024 2:45 PM
Text:
http://www.redwoodcity.org/home/showdocument?id=1948
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0091/PC RESO 800 MAIN HOTEL SEQUOIA <br />REV: 09-01-23 VR <br />Page 10 of 32 <br />condition of approval of this development. Per California Government Code Section <br />66020, this 90-day protest period has begun as of the date of the approval of this <br />application. [SDR][OFFICE OF THE CITY ATTORNEY] <br />Landscaping and Site Improvements <br />12. Water-Efficient Landscaping – Provide a landscaping and irrigation plan <br />conforming to the California Water-Efficient Landscape Ordinance (AB 1881), <br />including an automatic irrigation system (drip, micro-spray, or bubblers) with a rain <br />sensor, and show these measures on the building permit plans. <br />[COA][ENGINEERING] <br />13. Tree Survey - Provide a tree survey that identifies type, diameter at breast height <br />(DBH), condition and location prior to building permit issuance. [COA][PLANNING] <br />14. Tree Protection - Provide tree protection measures for ordinance-sized trees near <br />the project and show these measures on the building permit plans. <br />[COA][PLANNING] <br />15. Tree Removal Permit - Obtain a Tree Removal Permit for the removal and tree <br />trimming of all ordinance-size trees (number, type and location), as defined in the <br />City’s Tree Preservation Ordinance, prior to building permit issuance. <br />[SDR][PLANNING] <br />16. Street Trees - A total of 6 (24-inch box) street trees shall be planted along Broadway <br />and along Main Street frontages. The tree species and location will be determined <br />by the City Engineer and Planning Manager. These improvements shall be included <br />as part of the building permit submittal package. Newly planted trees shall be <br />irrigated and maintained by the applicant. [SDR][PLANNING] <br />17. Project Frontage – Prior to building permit issuance, the project shall finalize the <br />Project’s Broadway frontage as determined by the Community Development & <br />Transportation Director following the City Council’s decision on whether to establish <br />a pedestrian mall on Broadway and its design. Specific elements to be finalized <br />include the sidewalk width (match existing or match width at adjacent parcel) and <br />whether the corner is flush with the pavement or has a 6” curb. [COA] <br />[ENGINEERING] <br />18. Stormwater Runoff - Post-construction runoff into the storm drain shall not exceed <br />pre-construction runoff levels. The applicant’s design professional shall evaluate <br />the project’s impact to the City’s storm drainage system and shall substantiate their <br />conclusions with drainage calculations to the satisfaction of the City Engineer. The <br />project shall be designed in conformance with the Drainage Guidelines for <br />Residential or Commercial Development. [SDR] [ENGINEERING] <br />19. Exterior Lighting – Provide a lighting plan for proposed exterior lighting, including <br />cut sheets, a photometric site plan demonstrating light levels and a diagram showing <br />light spillover. This information shall be included in the building permit plans. New
The URL can be used to link to this page
Your browser does not support the video tag.