Laserfiche WebLink
ATTY/RESO.0091/PC RESO 800 MAIN HOTEL SEQUOIA <br />REV: 09-01-23 VR <br />Page 14 of 32 <br />Section of the AWWA and observed by Public Works staff. The cross-connection <br />control test method must be included in the Recycled Water Report. The applicant <br />is responsible for all fees associated with the performance of the cross-connection <br />control test. [COA] [ENGINEERING] <br /> <br />33. Discharge Permit for Subterranean Floor - If the subterranean floor requires <br />groundwater pumping into the sewer system, a Discharge fee will apply and a <br />Discharge Permit will be required by Silicon Valley Clean Water (SCVW) prior to <br />issuance of the building permit. [SDR][ENGINEERING] <br />34. Backflow Protection – Backflow protection on all water services is required. The <br />backflow preventer shall be above grade and located on private property, accessible <br />to the Public Works division for testing. The Building Official or City Engineer may <br />approve an alternative location if deemed consistent with the California Historic <br />Building Code. [COA][ENGINEERING] <br />35. Fire Flow - The Project shall meet fire flow requirements as established by the Fire <br />Department, which are based on the Fire Code. Fire flow tests are typically <br />performed during the preliminary design phase but must be completed prior to <br />submittal of final design. Applicant shall contact the Fire Department for fire flow <br />requirements, and then submit a written fire flow test request to Engineering. <br />[COA][ENGINEERING] <br />36. C3 Requirements – Plans shall be designed to meet C3 requirements of the <br />Municipal Regional Permit (MRP) NPDES Permit CAS612008 and be in compliance <br />with San Mateo County C.3 Stormwater Technical Guidance. <br />[SDR][ENGINEERING] <br />a. Treatment Controls – Treatment measures to be shown on final <br />improvement or grading plans shall not differ materially from the treatment <br />measures presented on the project’s Planning Submittal, dated April 1, <br />2022, without written approval from the Engineering Department. <br />b. Treatment Measure Inspection – Applicant shall coordinate installation of <br />stormwater treatment measures with the City, shall arrange to have the <br />City’s designated inspector present at the time of installation, and shall have <br />the City’s designated inspector complete a final inspection of installed <br />stormwater treatment measure immediately after installation is complete. <br />37. Stormwater Management Plan (SWMP) – Applicant shall prepare a SWMP that <br />includes, at a minimum, exhibit(s) showing drainage areas and location of Low <br />Impact Development (LID) treatment measures; total project site area and total area <br />of land disturbed; total new and/or replaced impervious area; treatment measures <br />and hydraulic sizing calculations; a listing of source control and site design measures <br />to be implemented at the site; saturated hydraulic conductivity rate(s) at relevant <br />locations or hydrologic soil type (A, B, C or D) and source of information; elevation