My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09.05.2023 Reso 0091 PC23-20 PC Reso 800 Main Hotel Sequoia
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2023
>
09.05.2023 Reso 0091 PC23-20 PC Reso 800 Main Hotel Sequoia
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 2:45:44 PM
Creation date
10/21/2024 2:45:35 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 2:45 PM
Modified:
10/21/2024 2:45 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.240STIMTR
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 2:45 PM
Modified:
10/21/2024 2:45 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.240STIMTR
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0091/PC RESO 800 MAIN HOTEL SEQUOIA <br />REV: 09-01-23 VR <br />Page 15 of 32 <br />of high seasonal groundwater table; and a brief summary of how the project is <br />complying with Provision C.3 of the MRP. [COA][ENGINEERING] <br />38. Stormwater BMPs - Stormwater Pollution Prevention Program Best Management <br />Practices (BMPs) for construction shall be implemented to protect water quality, in <br />accordance with the approved Stormwater Pollution Prevention Plan (SWPPP). <br />BMP plan sheets are available electronically for inserting into project plans. <br />[SDR][ENGINEERING] <br /> <br />Street Infrastructure Improvements <br />39. Streetlights - A new streetlight shall be installed, if needed, as determined by the <br />City Engineer. The style and location of all streetlights shall be as determined by the <br />City Engineer and Planning Manager. [SDR][ENGINEERING] <br />40. Repair or Replace Street Infrastructure - Restore streets surrounding the project <br />site to the satisfaction of the City Engineer prior to issuance of a Certificate of <br />Occupancy. This shall include, at a minimum, grind/overlay of half width of both <br />frontage streets. When this requires additional pavement restoration, the Engineer <br />shall approve the preferred layout of pavement markings. [SDR][ENGINEERING] <br /> <br />41. Shoring for Excavations – No tiebacks shall extend into the public right of way or <br />onto adjacent properties without the written agreement of the City and/or private <br />property owner. Any tie-backs within the City’s right of way shall be de-tensioned <br />prior to permit sign-off and/or project acceptance. [COA] [ENGINEERING] <br />Fire and Safety <br /> <br />42. Construction Permits. Individual building and fire code permit reviews will be <br />required on all demolitions, remodels, tenant improvements, and new construction <br />in accordance with the legally adopted codes and standards in place at the time of <br />building permit application. [COA] [FIRE] <br />43. Premise Identification - Address Numbers. All buildings must be provided with <br />address identification that is legible and placed in a position that is visible from the <br />street or road facing the street from which the building takes the address, numbers <br />to be a minimum size of 12-inch in height, with contrasting background, and all <br />address numbers to be illuminated and visible from the street during darkness. [CFC <br />505.1] [CFC Section 505.1 and City of Redwood City Code, Ordinances Section <br />9.48] [COA] [FIRE] <br />44. Emergency Responder Radio Coverage System (ERRCS). An emergency <br />responder radio coverage system (ERRCS) is required. [CFC §510.1] The enclosure <br />of the ERRCS head-end and riser connection equipment room must be installed and <br />protected with two-hour fire-rated construction. The backbone cable enclosure must <br />be installed and protected with two-hour fire-rated construction, and penetrations <br />protected in accordance with the CBC §714. The room in which the ERRCS head- <br />end unit is installed must be provided with air conditioning to protect against
The URL can be used to link to this page
Your browser does not support the video tag.