My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09.05.2023 Reso 0091 PC23-20 PC Reso 800 Main Hotel Sequoia
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2023
>
09.05.2023 Reso 0091 PC23-20 PC Reso 800 Main Hotel Sequoia
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 2:45:44 PM
Creation date
10/21/2024 2:45:35 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0091/PC RESO 800 MAIN HOTEL SEQUOIA <br />REV: 09-01-23 VR <br />Page 26 of 32 <br />shall be submitted to the Community Development and Transportation <br />Department for review and approval before the issuance of any building permit. <br />[COA][MMRP] <br />e. Vibration Reduction (formerly FEIR Mitigation 11-3, SEIR Mitigation NO-3): <br />The City shall reduce ground-borne vibration levels that may be generated by <br />future site-specific demolition and construction activities by imposing conditions <br />of approval on all future projects involving demolition and construction activities, <br />which conditions shall require the Project Applicant to ensure the following <br />ground-borne vibration abatement measures are implemented by the <br />construction contractor: <br />• Restrict vibration-generating activity to between the hours of 7:00 AM and <br />5:00 PM, Monday through Friday except when authorized by the Building <br />Official (Redwood City Municipal Code Section 24.32). <br />• Notify occupants of land uses located within 200 feet of pile-driving <br />activities of the project construction schedule in writing. <br />• Investigate in consultation with City staff possible pre-drilling of pile holes <br />as a means of minimizing the number of percussions required to seat the <br />pile. <br />• Conduct a pre-construction site survey documenting the condition of any <br />historic structure located within 200 feet of pile driving activities. <br />• Monitor pile driving vibration levels to ensure vibration does not exceed <br />appropriate thresholds for the building (5 mm/sec (0.20 inches/sec) ppv <br />for structurally sound buildings and 2 mm/sec (0.08 inches/sec) ppv for <br />historic buildings. [COA][MMRP] <br />f. Best Management Practices for Construction Dust Suppression (SEIR <br />Mitigation Measure AQ-2a): All subsequent projects, regardless of size, shall <br />implement best management practices to reduce construction impacts, <br />particularly fugitive dust, to a less-than significant level. Specifically, the project <br />applicant shall require all construction plans to specify implementation of the <br />following best management practices: <br />• All exposed surfaces (e.g., parking areas, staging areas, soil piles, <br />graded areas, and unpaved access roads) shall be watered two times <br />per day. • All haul trucks transporting soil, sand, or other loose material <br />off-site shall be covered. <br />• All visible mud or dirt track-out onto adjacent public roads shall be <br />removed using wet power vacuum street sweepers at least once per day. <br />The use of dry power sweeping is prohibited.
The URL can be used to link to this page
Your browser does not support the video tag.