My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso23-23 0111 PC23-23 PC Reso Stanford Block E
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2023
>
Reso23-23 0111 PC23-23 PC Reso Stanford Block E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 2:50:21 PM
Creation date
10/21/2024 2:50:10 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
12/5/2023
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 2:50 PM
Modified:
10/21/2024 2:50 PM
Text:
https://library.municode.com/ca/redwood_city/codes/city_code?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.240STIMTR
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4873-4401-5244 v1 <br />37.Backflow Protection – Backflow protection on all water services is required. The backflow preventer <br />shall be above grade and located on private property, accessible to the Public Works division for <br />testing. [COA][ENGINEERING] <br />38.C3 Requirements - Plans shall be designed to meet C3 requirements of the Municipal Regional <br />Permit (MRP) NPDES Permit CAS612008 and be in compliance with San Mateo County C.3 <br />Stormwater Technical Guidance. [SDR][ENGINEERING] <br />a.Treatment Controls – Treatment measures to be shown on final improvement or grading <br />plans shall not differ materially from the treatment measures presented on the project’s <br />Vesting Tentative Map, approved on December 5, 2023, without written approval from <br />the Engineering Department. <br />b.Treatment Measure Inspection – Applicant shall coordinate installation of stormwater <br />treatment measures with the municipality, shall arrange to have the City’s designated <br />inspector present at the time of installation, and shall have the City’s designated inspector <br />complete a final inspection of installed stormwater treatment measure immediately after <br />installation is complete. <br />39.Stormwater Management Plan (SWMP) – Applicant shall prepare a SWMP that includes, at a <br />minimum, exhibit(s) showing drainage areas and location of Low Impact Development (LID) <br />treatment measures; total project site area and total area of land disturbed; total new and/or <br />replaced impervious area; treatment measures and hydraulic sizing calculations; a listing of source <br />control and site design measures to be implemented at the site; saturated hydraulic conductivity <br />rate(s) at relevant locations or hydrologic soil type (A, B, C or D) and source of information; elevation <br />of high seasonal groundwater table; and a brief summary of how the project is complying with <br />Provision C.3 of the MRP. [COA][ENGINEERING] <br />40.Construction General Permit – For construction activity resulting in a land disturbance of one acre <br />or more, applicant shall file a Notice of Intent (NOI) with the State Water Resources Control Board <br />under the Construction Activities Storm Water General Permit (General Permit). The NOI indicates <br />the applicant’s intent to comply with the San Mateo Countywide Stormwater Pollution Prevention <br />Program, including a Stormwater Pollution Prevention Plan (SWPPP). [SDR] [ENGINEERING] <br />41.Stormwater BMPs - Stormwater Pollution Prevention Program Best Management Practices (BMPs) <br />for construction shall be implemented to protect water quality, in accordance with the approved <br />Stormwater Pollution Prevention Plan (SWPPP). BMP plan sheets are available electron ically for <br />inserting into project plans. [SDR][ENGINEERING] <br />Street Infrastructure Improvements <br />42.Remainder Parcels and Parcels Not Being Developed – Any frontage improvements provided for <br />remainder parcels or parcels not being developed by this tentative map, are not considered to have <br />been constructed to serve such remainder parcels or parcels not being developed. Improvements <br />to facilitate development of such parcel(s) will be required as a condition of future development of <br />such parcel(s), and will be subject to those design standards in place at that future time. All frontage <br />improvements for the parcels being developed as part of this tentative m ap shall be properly <br />designed and constructed to current engineering design standards. <br />43.Streetlights - A new streetlight shall be installed, if needed, as determined by the City Engineer. <br />Streetlights are required on the construction of a new commercial building or performance of <br />ATTY/RESO.0111/PC RESO STANFORD BLOCK E - EXHIBIT A & B <br />REV: 11-30-23 VR Page 7 of 20
The URL can be used to link to this page
Your browser does not support the video tag.