My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso23-23 0111 PC23-23 PC Reso Stanford Block E
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2023
>
Reso23-23 0111 PC23-23 PC Reso Stanford Block E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 2:50:21 PM
Creation date
10/21/2024 2:50:10 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
12/5/2023
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 2:50 PM
Modified:
10/21/2024 2:50 PM
Text:
https://library.municode.com/ca/redwood_city/codes/city_code?nodeId=CH24NORE_ARTIIEXUNNO_DIV3CO
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 2:50 PM
Modified:
10/21/2024 2:50 PM
Text:
http://permits.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4873-4401-5244 v1 <br />b.One elevator shall be connected to backup generator power in order to remain operable <br />during emergencies. This elevator shall be provided with appropriate signage and shall extend <br />to all floors including the lower levels of the parking structure. <br />c.All additional elevators shall be connected to battery backup with sufficient power to bring <br />the elevator to the exit level in the event of an emergency. <br />d.All elevators shall be equipped with smoke curtains. <br />Construction-Related Activities <br />60.Verification for Dimensions – All dimensions, including building location on the site, setbacks, <br />building height, etc. shall be verified by a licensed surveyor. A survey report shall be provided to the <br />Building Inspector for review and approval. [COA][BUILDING] <br />61.Sales and Use Taxes – Applicant shall use good faith efforts to register with the Board of Equalization <br />to create an ID prior to project construction and operation. This maximizes the City’s allocation of <br />sales and use taxes associated with project construction. Contact the Finance Department at (650) <br />780-7097. [COA][FINANCE] <br />62.Hours of Construction – On-Site Construction activity is permitted between 7:00 a.m. and 8:00 p.m. <br />Monday through Friday, except as permitted on weekends by the Building Official, and shall adhere <br />to the City’s Noise Ordinance. If possible, the noisiest construction activities shall be scheduled for <br />daytime hours when the ambient noise levels are highest. [SDR][BUILDING] <br />63.Construction Sign - Prior to the start of any construction work, including demolition, install at least <br />one 36” x 48” (minimum) construction sign in a visible location along the project frontage for the <br />duration of construction. The sign shall include, at minimum, the follow ing information: project <br />name & address, elevation or rendering, construction manager (name, phone number), anticipated <br />completion (season, year), and the City’s permitting website http://permits.redwoodcity.org <br />[COA][PLANNING] <br />64.Construction Meetings – The applicant is required to contact the Permit Counter (650.780.7350) to <br />schedule the following meetings prior to or during construction. [COA][BUILDING] <br />a)Pre-Construction - Prior to building permit issuance, schedule a pre-construction meeting with <br />Engineering, Building, Fire, and Planning staff to discuss the inspection process and <br />requirements for construction and site work. The applicant shall arrange for the attendance of <br />the owner, developer, construction manager, contractor, and all subcontractors who are <br />responsible for grading and erosion and sedimentation protection controls. <br />65.Materials Mock-Up – Prior to final foundation inspection, prepare a mock-up that is outdoors, <br />readily accessible, and will remain intact until the project has reached substantial completion. The <br />mock-up should include all project colors and materials, windows for the base and top, balconies, <br />lighting, and architectural details, as well as construction details, such as the weep screed, to <br />understand how the design addresses them. Then schedule a mock-up meeting with the Planning <br />for final review and approval of the project details. Submit an updated colors and materials board <br />or details if any changes are made as a result of the mock-up meeting. [COA][PLANNING] <br />66.Certification Letters - Prior to final inspection, submit certification letters from the following <br />architects verifying that the project, as constructed, complies with approved plans. After the <br />ATTY/RESO.0111/PC RESO STANFORD BLOCK E - EXHIBIT A & B <br />REV: 11-30-23 VR Page 10 of 20
The URL can be used to link to this page
Your browser does not support the video tag.