Laserfiche WebLink
4873-4401-5244 v1 <br />performed during the preliminary design phase but must be completed prior to submittal of final <br />design. Applicant shall provide current water flow information obtained from the Water <br />Department and provide the observed flow, the available flow at 20psi, and the required fire flow <br />in accordance with Appendix B as noted above. The required fire flow, as required by the CFC <br />Appendix B must be provided on the building permit plans prior to the project proceeding with <br />construction. [COA][ENGINEERING AND FIRE] <br />52.Fire Department Knox Building Access – A Knox Key box is required as part of this project to allow <br />emergency access for firefighters. Indicate on the plans that a Knox key box will be provided on the <br />building at a location approved by the Fire Department. (CFC 506). [SDR][FIRE] <br />53.Radio Coverage for Emergency Responders – All building and parking garages shall have approved <br />radio coverage for emergency responders within the building. Upon completion of the building <br />construction, a radio coverage test shall be conducted per the applicable codes and standards and <br />if the test fails an Emergency Responders Radio Coverage System shall be installed. Verify any Blue <br />Box phone communication requirements with the Redwood City Police Department. [COA][POLICE] <br />54.Portable Fire Extinguisher Required – Portable fire extinguishers, with a minimum classification of <br />2A:B:C are required to be permanently installed in the building within 75 feet of travel from all <br />portions of the building in compliance with NFPA 10 and CFC Section 906. Indicate the location and <br />size of these fire extinguishers on the plans. Provide a section detail indicating how the fire <br />extinguishers are to be mounted to the building. [SDR][FIRE]. <br />55.High-Rise Construction – The building is considered a High-Rise and must comply with all codes for <br />High-Rise construction if the height of the top occupied floor slab exceeds 75 feet. Height is <br />measured from the lowest point of the gutter at the lowest street elevation. [SDR][BUILDING] <br />56.Combination Sprinkler/Standpipe System – The California Fire Code requires building four or more <br />stories in height to be provided with a Class 1, manual standpipe system. Provide plans for the <br />design of this system or indicate the requirements for this system and list the design and installation <br />as a deferred submittal on the cover sheet of the plans prior to installation of the system. NOTE: <br />The design of the fire sprinkler system must be an NFPA 13 system. The notation for deferred <br />submittals must indicate that the fire sprinkler system will be a combination sprinkler/standpipe <br />system with hose connections on all levels of the building. (CFC Section 905). [SDR][FIRE] <br />57.Fire Department Access Plan – Provide a fire department access plan that indicates all routes of fire <br />department road access required to within 150 feet of all portions of the exterior of the building <br />unless otherwise approved by the Redwood City Fire Department (CFC Section 503). <br />58.Addressing and Access – The following requirements apply: [COA][FIRE] <br />a.Addresses must be logical, sequential numbers, i.e. First Floor 101, 102, 103, Second Floor <br />202, 203, 204, as opposed to F303, G401, etc. <br />b.Floor plan maps shall be submitted with unit numbers at all entrances, excluding fire exits. <br />c.Provide a knox box with the appropriate keys, fobs, or access cards for public safety personnel <br />at the main entrance, as opposed to just RFID readers or similar devices. <br />59.Elevator Requirements – The following requirements for elevators apply: [SDR][BUILDING] <br />a.One elevator shall be available for use as an accessible means of egress in case of emergency. <br />ATTY/RESO.0111/PC RESO STANFORD BLOCK E - EXHIBIT A & B <br />REV: 11-30-23 VR Page 9 of 20