Laserfiche WebLink
ATTY/RESO.0025/ PC APPROVING AP 2020-060 <br />REV: 03-31-2023 JB <br />Page 14 of 18 <br />39. C3 Requirements - Plans shall be designed to meet C3 requirements of the <br />Municipal Regional Permit (MRP) NPDES Permit CAS612008 and be in compliance <br />with San Mateo County C.3 Stormwater Technical Guidance. <br />[SDR][ENGINEERING] a. Treatment Controls – Treatment measures to be shown on <br />final improvement or grading plans shall not differ materially from the <br />treatment measures presented on the project’s Vesting Tentative Map, <br />approved on _4/4/23____, without written approval from the Engineering <br />Department. b. Treatment Measure Inspection – Applicant shall coordinate <br />installation of stormwater treatment measures with the municipality, shall <br />arrange to have the City’s designated inspector present at the time of <br />installation, and shall have the City’s designated inspector complete a final <br />inspection of installed stormwater treatment measure immediately after <br />installation is complete. 40. Stormwater Management Plan (SWMP) – Applicant shall prepare a SWMP with <br />the building permit plans that includes, at a minimum, exhibit(s) showing drainage <br />areas and location of Low Impact Development (LID) treatment measures; total <br />project site area and total area of land disturbed; total new and/or replaced <br />impervious area; treatment measures and hydraulic sizing calculations; a listing of <br />source control and site design measures to be implemented at the site; saturated <br />hydraulic conductivity rate(s) at relevant locations or hydrologic soil type (A, B, C or <br />D) and source of information; elevation of high seasonal groundwater table; and a <br />brief summary of how the project is complying with Provision C.3 of the MRP. <br />[COA][ENGINEERING] 41. Stormwater BMPs - Stormwater Pollution Prevention Program Best Management <br />Practices (BMPs) for construction shall be implemented to protect water quality, in <br />accordance with the approved Stormwater Pollution Prevention Plan (SWPPP). <br />BMP plan sheets are available electronically for inserting into project plans. <br />[SDR][ENGINEERING] <br />Street Infrastructure Improvements 42. Green Infrastructure Improvements – Stormwater treatment features shall be <br />included in the project frontage along Hemlock Avenue and Linden Street, sized to <br />treat the half-street tributary area of the project frontage within the building permit <br />plans. [SDR][ENGINEERING] 43. Crosswalk Improvements – a final civil design for crosswalk and curb ramp <br />improvements at intersections of El Camino Real and Hemlock Avenue, Hemlock <br />Avenue and Linden Street at both north and east legs of the intersection shall be <br />provided to the City for staff review prior to the building permit issuance. After the <br />City approval, the crosswalk and curb ramp improvements shall be implemented as <br />part of this project.