Laserfiche WebLink
ATTY/RESO.0025/ PC APPROVING AP 2020-060 <br />REV: 03-31-2023 JB <br />Page 15 of 18 <br /> 44. Repair or Replace Street Infrastructure - Restore streets surrounding the project <br />site to the satisfaction of the City Engineer at project completion. When this requires <br />additional pavement restoration, the Engineer shall approve the preferred layout of <br />pavement markings. [SDR][ENGINEERING] <br /> <br />Fire and Safety <br /> 45. Radio Coverage for Emergency Responders – All building and parking garages <br />shall have approved radio coverage for emergency responders within the building. <br />Upon completion of the building construction, a radio coverage test shall be <br />conducted per the applicable codes and standards and if the test fails an Emergency <br />Responders Radio Coverage System shall be installed. Verify any Blue Box phone <br />communication requirements with the Redwood City Police Department. <br />[COA][POLICE] <br /> 46. Addressing and Access – The following requirements apply: [COA][FIRE] <br />a. Addresses must be logical, sequential numbers, i.e. First Floor 101, 102, <br />103, Second Floor 202, 203, 204, as opposed to F303, G401, etc. <br />b. Floor plan maps shall be submitted with unit numbers at all entrances, <br />excluding fire exits, prior to building permit issuance. <br />Construction-Related Activities 47. Hours of Construction – On-Site Construction activity is permitted between 7:00 <br />a.m. and 8:00 p.m. Monday through Friday, except as permitted on weekends by <br />the Building Official, and shall adhere to the City’s Noise Ordinance. If possible, the <br />noisiest construction activities would be scheduled for daytime hours when the <br />ambient noise levels are highest. [SDR][BUILDING] 48. Construction Sign - Prior to the start of any construction work, including demolition, <br />install at least one 36” x 48” (minimum) construction sign in a visible location along <br />the project frontage for the duration of construction. The sign shall include, at <br />minimum, the following information: project name & address, elevation or rendering, <br />construction manager (name, phone number), anticipated completion (season, <br />year), and the City’s permitting website http://permits.redwoodcity.org <br />[COA][PLANNING] 49. Pre-Construction Meeting - After City permits are approved, but prior to start of <br />construction, hold a preconstruction conference with Engineering and Building staff <br />and other interested parties. The developer shall arrange for the attendance of the <br />construction manager, contractor, and all subcontractors who are responsible for <br />grading and erosion and sedimentation protection controls. [COA][ENGINEERING]