My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso 23-04 0025 C Reso Approving AP2020-060 2336 El Camino Real
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2023
>
Reso 23-04 0025 C Reso Approving AP2020-060 2336 El Camino Real
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 2:56:24 PM
Creation date
10/21/2024 2:56:19 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
4/4/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0025/ PC APPROVING AP 2020-060 <br />REV: 03-31-2023 JB <br />Page 16 of 18 <br />34. Certification Letters - Prior to final inspection, submit certification letters from the <br />following architects verifying that the project, as constructed, complies with approved <br />plans. After the certification letter has been submitted, the project planner will also <br />confirm substantial compliance with the approved plans during the scheduled final <br />inspection. [COA][PLANNING]: <br />a. Project Landscape Architect verifying substantial conformance with the <br />approved landscape plan, including species, size, quantity, and location of <br />the approved trees, shrubs, and groundcover. It shall also verify landscape <br />lighting, fencing, irrigation, and other details as applicable. <br />b. Project Architect verifying substantial conformance with the approved <br />elevations, colors, materials, exterior light fixtures, and architectural details. <br /> 35. Construction Management and Staging - Prior to encroachment permit issuance, <br />submit a construction parking management plan, which shall outline the number of <br />construction workers by phase, phase duration, where parking will be located for <br />each phase. Construction parking, material storage, equipment, or other <br />construction-related uses are not allowed within the City right of way without prior <br />approval from the City Engineer. [COA][ENGINEERING] 36. Lane Closures - Traffic control for lane closures shall conform to the Work Area <br />Traffic Control Handbook. Street closures require submission of traffic control plans <br />and approval in advance. [SDR][ENGINEERING] 37. Public Parking During Construction – Temporary parking meter permits shall be <br />issued prior to removing any public parking spaces from public use during <br />construction. An application fee of $30.00, together with the parking meter fees <br />applicable for the expected duration of the temporary parking meter permit ($2.00- <br />$8.00 daily per space depending on location) shall be paid in advance prior to <br />issuance of the permit. [SDR][ENGINEERING] 38. Winterizing - If construction is not complete by the start of the wet season (October <br />1 through April 30), implement a winterization program to minimize the potential for <br />erosion and sedimentation. As appropriate to the site and status of construction, <br />winterization requirements shall include inspecting/maintaining/cleaning all soil <br />erosion and sedimentation controls prior to, during, and immediately after each <br />storm event; stabilizing disturbed soils through temporary or permanent seeding, <br />mulching, matting, tarping or other physical means; rocking unpaved vehicle access <br />to limit dispersion of much onto public right-of-way; and covering/tarping stored <br />construction materials, fuels, and other chemicals. Plans to include proposed <br />measures to prevent erosion and polluted runoff from all site conditions shall be <br />submitted for approval by CDD prior to beginning construction. As site conditions <br />warrant, the City Engineer may direct the applicant to implement additional <br />winterization requirements. [COA][ENGINEERING] <br />
The URL can be used to link to this page
Your browser does not support the video tag.