ATTY/RESO.0019/PC RESO 2336 EL CAMINO REAL <br />REV: 05-01-24 VR <br />Page 15 of 18 <br />37. Crosswalk Improvements – a final civil design for crosswalk and curb ramp improvements at intersections of El Camino Real and Hemlock Avenue, Hemlock Avenue and Linden Street at both north and east legs of the intersection shall be provided to the City for staff review prior to the building permit issuance. After the City approval, the crosswalk and curb ramp improvements shall be implemented as part of this project. <br /> 38. Repair or Replace Street Infrastructure - Restore streets surrounding the project site to the satisfaction of the City Engineer at project completion. When this requires additional pavement restoration, the Engineer shall approve the preferred layout of pavement markings. [SDR][ENGINEERING] Fire and Safety 39. Radio Coverage for Emergency Responders – All building and parking garages shall have approved radio coverage for emergency responders within the building. Upon completion of the building construction, a radio coverage test shall be conducted per the applicable codes and standards and if the test fails an Emergency Responders Radio Coverage System shall be installed. Verify any Blue Box phone communication requirements with the Redwood City Police Department. [COA][POLICE] 40. Addressing and Access – The following requirements apply: [COA][FIRE] a. Addresses must be logical, sequential numbers, i.e. First Floor 101, 102, 103, Second Floor 202, 203, 204, as opposed to F303, G401, etc.. b. Floor plan maps shall be submitted with unit numbers at all entrances, excluding fire exits. Construction-Related Activities 41. Hours of Construction – On-Site Construction activity is permitted between 7:00 a.m. and 8:00 p.m. Monday through Friday, except as permitted on weekends by the Building Official, and shall adhere to the City’s Noise Ordinance. If possible, the noisiest construction activities would be scheduled for daytime hours when the ambient noise levels are highest. [SDR][BUILDING] 42. Construction Sign - Prior to the start of any construction work, including demolition, install at least one 36” x 48” (minimum) construction sign in a visible location along the project frontage for the duration of construction. The sign shall include, at minimum, the following information: project name & address, elevation or rendering, construction manager (name, phone number), anticipated completion (season, year), and the City’s permitting website http://permits.redwoodcity.org [COA][PLANNING] 43. Pre-Construction Meeting - After City permits are approved, but prior to start of construction, hold a preconstruction conference with Engineering and Building staff