My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso24-02 0019 PC Reso 2336 El Camino Real
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2024
>
Reso24-02 0019 PC Reso 2336 El Camino Real
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 3:00:47 PM
Creation date
10/21/2024 3:00:41 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 3:00 PM
Modified:
10/21/2024 3:00 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH20MOVETR_ARTVIISTSTPA_DIV7TEPAMEPE
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0019/PC RESO 2336 EL CAMINO REAL <br />REV: 05-01-24 VR <br />Page 16 of 18 <br />and other interested parties. The developer shall arrange for the attendance of the construction manager, contractor, and all subcontractors who are responsible for grading and erosion and sedimentation protection controls. [COA][ENGINEERING] 44. Certification Letters - Prior to final inspection, submit certification letters from the following architects verifying that the project, as constructed, complies with approved plans. After the certification letter has been submitted, the project planner will also confirm substantial compliance with the approved plans during the scheduled final inspection. [COA][PLANNING]: a. Project Landscape Architect verifying substantial conformance with the approved landscape plan, including species, size, quantity, and location of the approved trees, shrubs, and groundcover. It shall also verify landscape lighting, fencing, irrigation, and other details as applicable. b. Project Architect verifying substantial conformance with the approved elevations, colors, materials, exterior light fixtures, and architectural details. 45. Construction Management and Staging - Prior to encroachment permit issuance, submit a construction parking management plan, which shall outline the number of construction workers by phase, phase duration, where parking will be located for each phase. Construction parking, material storage, equipment, or other construction-related uses are not allowed within the City right of way without prior approval from the City Engineer. [COA][ENGINEERING] 46. Lane Closures - Traffic control for lane closures shall conform to the Work Area Traffic Control Handbook. Street closures require submission of traffic control plans and approval in advance. [SDR][ENGINEERING] 47. Public Parking During Construction – Temporary parking meter permits shall be issued prior to removing any public parking spaces from public use during construction. An application fee of $30.00, together with the parking meter fees applicable for the expected duration of the temporary parking meter permit ($2.00-$8.00 daily per space depending on location) shall be paid in advance prior to issuance of the permit. [SDR][ENGINEERING] 48. Winterizing - If construction is not complete by the start of the wet season (October 1 through April 30), implement a winterization program to minimize the potential for erosion and sedimentation. As appropriate to the site and status of construction, winterization requirements shall include inspecting/maintaining/cleaning all soil erosion and sedimentation controls prior to, during, and immediately after each storm event; stabilizing disturbed soils through temporary or permanent seeding, mulching, matting, tarping or other physical means; rocking unpaved vehicle access to limit dispersion of much onto public right-of-way; and covering/tarping stored construction materials, fuels, and other chemicals. Plans to include proposed measures to prevent erosion and polluted runoff from all site conditions shall be submitted for approval by CDD prior to beginning construction. As site conditions warrant, the City Engineer may
The URL can be used to link to this page
Your browser does not support the video tag.