Laserfiche WebLink
ATTY/RESO.0019/PC RESO 2336 EL CAMINO REAL <br />REV: 05-01-24 VR <br />Page 7 of 18 <br />features, permeable pavement materials, infiltration basins or engineered <br />designs. <br /> <br />The project complies with the zoning standards for on-site permeable area. The <br />project’s landscaping features will provide appropriate drainage to capture and <br />treat stormwater using flow-through planters and bioretention areas. In addition, a <br />Condition of Approval has been incorporated that would ensure compliance with <br />the stormwater runoff requirements per the City’s Engineering standards. <br /> <br />Section 6. Pursuant to Zoning Code Article 30 (Off-Street Parking and Loading), <br />Section 30.5, the Commission finds that the project site has adequate on-street parking <br />on the Center Street frontage and is in close proximity to retail services, namely the <br />Woodside Central Shopping Center and numerous retail and services on El Camino Real, <br />therefore the requirement for two visitor parking spaces can be waived. <br /> <br />Section 7. The Tentative Map, Condominium Permit, and Architectural Permit are <br />hereby granted based on the Planning Commission’s consideration and reliance on the <br />CEQA memorandum and the required permit findings and in accordance with the plans, <br />details, and descriptions and subject to the Conditions of Approval in Exhibit A. <br /> <br />Section 8. This Resolution is effective upon its adoption. <br /> <br /> <br /> <br />* * *