My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso24-04 0022 PC Reso 77 Birch Street
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2024
>
Reso24-04 0022 PC Reso 77 Birch Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 3:01:44 PM
Creation date
10/21/2024 3:01:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0022/PS RESO 77 BIRCH STREET – EXHIBIT A <br />REV: 05-16-24 VR <br />Page 6 of 10 <br />30. Recycled Water Report - The applicant shall enter into a Recycled Water Use Agreement <br />and shall hire an engineer licensed in California and experienced in the field of wastewater <br />treatment to prepare a recycled water report for dual plumbed facilities, pursuant to <br />California Water Code section 13522.5 and in accordance with California Code of <br />Regulations sections 60314 and 60323 (found within Title 22, Division 4, Chapter 3). The <br />first draft of the report and the signed agreement shall be submitted to Engineering prior <br />to building permit issuance, and will be routed to the Public Works Department for review <br />and coordination. [COA] [ENGINEERING] <br /> <br />31. Cross-Connection Control Test - Prior to issuance of the certificate of occupancy, all <br />applicable plumbing systems must pass a cross-connection control test, performed by a <br />Cross-Connection Control Specialist Certified through the CA-NV Section of the AWWA and <br />observed by Public Works staff. The cross-connection control test method must be included <br />in the Recycled Water Report. The applicant is responsible for all fees associated with the <br />performance of the cross-connection control test. [COA] [ENGINEERING] <br />32. Backflow Protection – Backflow protection on all water services is required. The backflow <br />preventer shall be above grade and located on private property, accessible to the Public <br />Works division for testing. [COA][ENGINEERING] <br />33. Fire Flow - The Project shall meet fire flow requirements as established by the Fire <br />Department which are based on the Fire Code. Fire flow tests are typically performed during <br />the preliminary design phase but must be completed prior to submittal of final design. <br />Applicant shall contact the Fire Department for fire flow requirements, and then submit a <br />written fire flow test request to Engineering. [COA][ENGINEERING] <br />34. C3 Requirements - Plans shall be designed to meet C3 requirements of the Municipal <br />Regional Permit (MRP) NPDES Permit CAS612008 and be in compliance with San Mateo <br />County C.3 Stormwater Technical Guidance. [SDR][ENGINEERING] a. Treatment Controls – Treatment measures to be shown on final improvement or <br />grading plans shall not differ materially from the treatment measures presented <br />on the project’s Vesting Tentative Map, approved on May 7, 2024 without written <br />approval from the Engineering Department. b. Treatment Measure Inspection – Applicant shall coordinate installation of <br />stormwater treatment measures with the municipality, shall arrange to have the <br />City’s designated inspector present at the time of installation, and shall have the <br />City’s designated inspector complete a final inspection of installed stormwater <br />treatment measure immediately after installation is complete. <br />35. Stormwater Management Plan (SWMP) – Applicant shall prepare a SWMP that includes, <br />at a minimum, exhibit(s) showing drainage areas and location of Low Impact Development <br />(LID) treatment measures; total project site area and total area of land disturbed; total new <br />and/or replaced impervious area; treatment measures and hydraulic sizing calculations; a
The URL can be used to link to this page
Your browser does not support the video tag.