<br />87
<br /> DMA-3: 7,004 SF of impervious area and 625 SF of pervious area; located adjacent to and south of DMA-2;
<br />required bioretention is 283 SF, and treatment proposed is 625 SF. Stormwater runoff from DMA-3 would be
<br />treated using a flow-through planter.
<br /> DMA-4: 5,182 SF of impervious area and 214 SF of pervious area; located in the southeastern part of the project
<br />component site; required bioretention is 208 SF, and treatment proposed is 214 SF. Stormwater runoff from
<br />DMA-4 would be treated using a flow-through planter.
<br /> DMA-5: 5,165 SF of impervious area and 122 SF of pervious area; located in the southwestern part of the project
<br />component site; required bioretention is 207 SF, and treatment proposed is 207 SF. Stormwater runoff from
<br />DMA-5 would be treated using a flow-through planter.
<br /> DMA-6: 1,656 SF of impervious area and 719 SF of pervious area; located adjacent to and south of DMA-3.
<br />Stormwater runoff from DMA-6 would be conveyed to a media filter.
<br /> DMA-7: 652 SF of impervious area and 1,055 SF of pervious area; located along the northern part of the project
<br />component site. This DMA would be self-retaining.
<br /> DMA-8: 0 SF of impervious area and 910 SF of pervious area; located adjacent to and south of DMA-3. This
<br />DMA would be self-retaining.
<br /> DMA-9: 5,615 SF of impervious area and 0 SF of pervious area; located along the southwestern border of the
<br />project component site (e.g., Woodside Road). Stormwater runoff from DMA would be treated using silva cells.
<br /> DMA-10: 6,181 SF of impervious area and 0 SF of pervious area; located along the northwestern border of the
<br />project component site (e.g., Woodside Road). Stormwater runoff from this DMA would be treated using silva
<br />cells.
<br /> DMA-11: 129 SF of impervious area and 94 SF of pervious area; located adjacent to DMA-1 and in the
<br />northeastern part of the project component site. This DMA would be self-retaining.
<br /> DMA-12: 1,333 SF of impervious area and 2,041 SF of pervious area; located along the southern part of the
<br />project component site and wrapping up the eastern side. This DMA would be self-retaining.
<br /> Total impervious area = 45,447 SF; total pervious area = 6,318 SF; total bioretention required = 1,683; total
<br />bioretention proposed = 2,057.
<br />The “alternate” preliminary stormwater control plan (Plan Sheet C.6.1, 10/30/23) identifies 13 DMAs: 10 are onsite
<br />(DMA-1, DMA-2, DMA-3, DMA-4, DMA-5, DMA-6, DMA-7, DMA-8, DMA-9, DMA-12, and DMA-13), and two
<br />are offsite (DMA-10 and DMA-11). These DMAs largely are the same configuration as the proposed stormwater
<br />control plan discussed above (Plan Sheet C.6), with differences as follows (see Plan Sheet C.6.1): Alternate DMA-1,
<br />DMA-2, DMA-3, DMA-4, DMA-5, DMA-6, DMA-7, and DMA-8 are essentially the same (or exactly the same);
<br />alternate DMA-9 is redesignated to an area to the east (formerly DMA-12 in the proposed plan); alternate DMA-10 is
<br />extended to the entire length of the western project border (along Woodside Road); alternate DMA-11 and DMA-12
<br />are parts of the original DMA-9; and alternate DMA-13 (the completely new DMA) is a redesignation of the former
<br />DMA-11 in the proposed plan.
<br /> In addition, the alternate plan DMAs also generally follow similar treatment control measures as indicated in the
<br />proposed stormwater control plan: alternative DMA-1 through DMA-5 would convey runoff from the roof and
<br />podium deck to flow-through planters containing bio-retention media; these would be located at the ground level with
<br />the exception of DMA-3, where the flow-through planter would be located on the podium. DMA-6, which is the
<br />uncovered ground-level building courtyard area, would convey runoff through internal plumbing to an onsite media
<br />filter. DMA-7 though DMA-9 would contain runoff from the perimeter of the project component site as well as the
<br />podium deck, and would be self-retaining areas. Alternate DMA-10, DMA-11, and DMA-12 would treat the Woodside
<br />Road frontage and sidewalk runoff using bioretention measures. Alternate DMA-13 (the former DMA-11 in the
<br />proposed plan) would contain runoff from the perimeter of the project component site and would be a self-retaining
<br />area.
<br /> More specifically, the alternate DMAs would provide treatment as follows (see Plan Sheet C.6.1 for all alternate DMA
<br />locations and the “Preliminary Treatment Control Measure Summary” on the plan sheet for alternate DMA
<br />specifications):
<br /> DMA-1: 5,219 SF of impervious area and 161 SF of pervious area; located in the northeastern part of the project
<br />component site; required bioretention is 161 SF, and treatment proposed is 161 SF. Stormwater runoff from
<br />DMA-1 would be treated using a flow-through planter.
<br /> DMA-2: 8,773 SF of impervious area and 377 SF of pervious area; located adjacent to and south of DMA-7 and
<br />extending into the center of the site; required bioretention is 352 SF, and treatment proposed is 377 SF.
<br />Stormwater runoff from DMA-2 would be treated using a flow-through planter.
<br />ATTY/RESO.0074/CC RESO 847 WOODSIDE (CEQA) - EXHIBIT 1 - CEQA CONSISTENCY CHECKLIST
<br />REV: 10-23-24 VR
<br />
<br />Page 87 of 135
|