Laserfiche WebLink
<br />95 <br /> <br />Prior EIR Determination Effect <br />Peculiar to <br />Project <br />Site? <br />New <br />Significant <br />Effect? <br />New Significant <br />Off-Site, <br />Cumulative <br />Impact? <br />New Information, <br />More Severe <br />Adverse Impact? DTPP EIR <br />DTPP Plan-Wide <br />Amendments <br />SEIR <br />Focused <br />GPU EIR <br />XII. MINERAL RESOURCES – Would the project: <br />a) Result in the loss of availability of a <br />known mineral resource that would <br />be of value to the region and the <br />residents of the state? <br />No <br />Impact <br />No <br />Impact <br />No <br />Impact No No No No <br />b) Result in the loss of availability of a <br />locally important mineral resource <br />recovery site delineated on a local <br />general plan, specific plan or other <br />land use plan? <br />No <br />Impact <br />No <br />Impact <br />No <br />Impact No No No No <br /> <br />Documentation: <br /> <br />1900 Broadway Component: <br />a. & b. No significant mineral deposits are identified in the DTPP area (DTPP program EIR p. 18-4) so implementation <br />of the DTPP was deemed not to be an impact in the EIR. The DTPP Plan-Wide Amendments program SEIR (p. 18- <br />8) concurred with the DTPP EIR conclusion. <br /> The project component site similarly does not contain valuable or locally important mineral resources, nor will it <br />consume extraordinary amounts of mineral resources. Implementation of the project component would not create an <br />impact on mineral resources. This project component would be consistent with the analysis in the EIR/SEIR because <br />it would not create new impacts or increase impacts, and there is no new information of substantial importance for <br />CEQA purposes. <br />CONCLUSION <br />With regards to the issue area of Mineral Resources, the following findings can be made: (1) no peculiar impacts to <br />the 1900 Broadway project component or its site have been identified, (2) there are no potentially significant effects <br />or off-site and/or cumulative impacts which were not discussed by the EIR/SEIR, (3) no substantial new information <br />has been identified which results in an impact which is more severe than anticipated by the EIR/SEIR, and (4) no <br />mitigation measures contained within the EIR/SEIR would be required because the project component specific impacts <br />would be less than significant. For these reasons, the mineral resources impacts of the proposed project component <br />would be consistent with the impacts identified in the EIR/SEIR and this project component does not require additional <br />environmental review under CEQA Guidelines section 15183. <br /> <br />847 Woodside Road Component: <br />a. & b. No significant mineral deposits are identified in the Focused GPU planning area (Focused GPU program EIR p. <br />4.12-1) so implementation of the Focused GPU was deemed not to be an impact. The project component site similarly <br />does not contain valuable or locally important mineral resources, nor will it consume extraordinary amounts of mineral <br />resources. Implementation of the project component would not create an impact on mineral resources. This project <br />component would be consistent with the analysis in the Focused GPU EIR because it would not create new impacts <br />or increase impacts, and there is no new information of substantial importance for CEQA purposes. <br />CONCLUSION <br />With regards to the issue area of Mineral Resources, the following findings can be made: (1) no peculiar impacts to <br />the 847 Woodside project component or its site have been identified, (2) there are no potentially significant effects or <br />off-site and/or cumulative impacts which were not discussed by the Focused GPU EIR, (3) no substantial new <br />information has been identified which results in an impact which is more severe than anticipated by the Focused GPU <br />EIR, and (4) no mitigation measures contained within the Focused GPU EIR would be required because the project <br />component specific impacts would be less than significant. For these reasons, the mineral resources impacts of the <br />proposed project component would be consistent with the impacts identified in the Focused GPU EIR and this project <br />component does not require additional environmental review under CEQA Guidelines section 15183. <br /> <br />ATTY/RESO.0074/CC RESO 847 WOODSIDE (CEQA) - EXHIBIT 1 - CEQA CONSISTENCY CHECKLIST <br />REV: 10-23-24 VR <br /> <br />Page 95 of 135