My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2024.12.16 Special Meeting
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2024
>
AgdaPkt 2024.12.16 Special Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 12:09:31 PM
Creation date
12/17/2024 12:08:18 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
12/16/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3 <br /> <br />Green text indicates new project <br />Orange text indicates modified project <br /> <br /> Project Name Description CIP (Y/N) Estimated <br />Start Year <br />Total Project <br />Costs <br />(Including All <br />Funds) <br />% Funded <br />with Fee <br />Revenue <br />Amount <br />Funded w/ Fee <br />Revenue <br />7 El Camino Real, traffic <br />safety improvements <br />within City Limits-Vision <br />Zero project <br />Install corridor enhancements including, but <br />not limited to: upgrading lane lines, bike <br />safety improvements, adjusting median <br />noses, installing retroreflective backplates, <br />installing traffic calming measures, installing <br />advanced limit lines at intersections, and <br />lighting enhancements. Caltrans has a <br />planned installation of a Class IV bikeway <br />along the entire El Camino Real within city <br />limits. The City would install protected <br />intersection treatments and HAWK beacons, <br />where feasible. <br />Y within 10 <br />years <br />$6,000,000 25% $1,500,000 <br />8 Woodside Road, between <br />Hess Road and Kentfield <br />Avenue <br />Install corridor enhancements including, but <br />not limited to: installing retroreflective <br />backplates, installing speed feedback signs, <br />installing advanced limit lines at <br />intersections, and installing bulb outs at <br />unsignalized intersections. Funds would also <br />be used to conduct a complete streets <br />corridor study and coordinate with Caltrans <br />to conduct a bike facility feasibility study. <br />Y within 10 <br />years <br />$2,045,000 25% $511,250 <br />9 Redwood Shores <br />Parkway, between Twin <br />Dolphin Dr and Shoreline <br />Dr-Vision Zero project <br />Install corridor enhancements including, but <br />not limited to: installing wayfinding signage <br />for bikers, installing accessible pedestrian <br />signals (APS), adjusting median noses, <br />installing traffic calming measures, installing <br />advanced limit lines at intersections, <br />installing green bike conflict markings, and <br />tightening curb radii. <br />Y within 10 <br />years <br />$1,220,000 25% $305,000 <br />10 Commuter Ferry Service Construct Ferry Terminal in Redwood City. Y within 5 <br />years <br />$23,760,000 25% $5,940,000 <br />7.A. - Page 10 of 27 <br />46
The URL can be used to link to this page
Your browser does not support the video tag.