Laserfiche WebLink
4 <br /> <br />Green text indicates new project <br />Orange text indicates modified project <br /> <br /> Project Name Description CIP (Y/N) Estimated <br />Start Year <br />Total Project <br />Costs <br />(Including All <br />Funds) <br />% Funded <br />with Fee <br />Revenue <br />Amount <br />Funded w/ Fee <br />Revenue <br />11 Alameda de las Pulgas <br />Corridor Improvements <br />Install pedestrian safety improvements along <br />Alameda de las Pulgas. <br />Y within 5 <br />years <br />$940,000 25% $235,000 <br />12 Caltrain Grade Crossings Conduct environmental review studies for <br />Caltrain grade separation within Redwood <br />City (6 intersections: Maple, Main, Chestnut, <br />Broadway, Brewster, Whipple) <br />Funds would be used for Environmental <br />Review. <br />Y within 5 <br />years <br />$4,000,000 25% $1,000,000 <br />13 Caltrain Grade Crossings Site improvements, bike and ped <br />undercrossing at James, connections to the <br />new transit center. <br />Y 10 to 20 <br />years <br />$50,000,000 25% $12,500,000 <br />14 Redwood City Bike Lanes Install bike lanes along roadway segments <br />identified in Redwood City Walk Bike Thrive <br />Plan. <br />Y various years $1,170,000 25% $292,500 <br />15 Redwood City Bike <br />Boulevards <br />Install bike boulevards along roadway <br />segments identified in Redwood City Walk <br />Bike Thrive Plan. <br />Y various years $2,125,000 25% $531,250 <br />16 James Avenue Cycle Track <br />(RWC Transit Center to <br />Elwood Street) <br />Install two-way Class IV cycle track. Y within 5 <br />years <br />$1,160,000 25% $290,000 <br />17 Maple Street Cycle Track <br />(Main Street to El Camino <br />Real) <br />Install two-way Class IV cycle track. Y within 5 <br />years <br />$895,000 25% $223,750 <br />18 Middlefield Road Cycle <br />Track (Winslow Street to <br />MacArthur Avenue) <br />Install Class IV separated bicycle lanes. Y within 10 <br />years <br />$2,575,000 25% $643,750 <br />19 Bay Road Cycle Track <br />(Woodside Road to <br />Florence Street) <br />Install Class IV separated bicycle lanes. Y within 10 <br />years <br />$2,970,000 25% $742,500 <br />20 Main Street Cycle Track <br />(Convention Way to El <br />Camino Real) <br />Install Class IV separated bicycle lanes. Y within 10 <br />years <br />$3,385,000 25% $846,250 <br />7.A. - Page 11 of 27 <br />47