Laserfiche WebLink
Project Name Description <br />CIP <br />(Y/N) <br />Estimated <br />Start Year <br />Total Project <br />Costs (Including <br />All Funds) <br />% Funded <br />with Fee <br />Revenue <br />Amount Funded w/ <br />Fee Revenue <br />Multi-modal projects <br />1 El Camino Real and Jefferson Ave Intersection Improvements- Vision Zero <br />project <br />Intersection geometry improvements, adding median <br />for better pedestrian crossing, high-visibility crosswalks, <br />etc.Y <br />within 10 <br />years $315,000 25%$78,750 <br />2 Broadway and Main Street Intersection Improvements-Vision Zero project Install intersection enhancements including, but not <br />limited to: upgrading crosswalks, adjusting median <br />noses, installing leading pedestrian interval, installing <br />retroreflective backplates, installing ADA compliant <br />curb ramps, installing traffic calming measures, and <br />installing advance limit lines. <br />Y <br />within 5 <br />years $1,080,000 25% $270,000 <br />3 Broadway and Woodside Road Intersection Improvements-Vision Zero project Install intersection enhancements including, but not <br />limited to: upgrading crosswalks, installing pedestrian <br />countdown heads and push buttons, upgrading signal <br />heads and installing retroreflective backplates, and <br />installing ADA compliant curb ramps. <br />Y <br />within 10 <br />years $690,000 25% $172,500 <br />4 Broadway and 5th Avenue Intersection Improvements-Vision Zero project Install intersection enhancements including, but not <br />limited to: upgrading crosswalks, adjusting median <br />noses, installing leading pedestrian interval, refresh cat <br />tracking through intersection, installing green bike <br />conflict markings, installing ADA compliant curb ramps, <br />and installing advance limit lines. <br />Y <br />within 5 <br />years $60,000 25%$15,000 <br />5 Whipple Avenue, between Veterans Blvd and El Camino Real-Vision Zero <br />project <br />Install intersection enhancements including, but not <br />limited to: upgrading crosswalks, installing new <br />crosswalk, and installing flashing stop signs.Y <br />within 10 <br />years $1,455,000 25% $363,750 <br />6 Broadway, between Cassia Street and Winslow Street-Vision Zero project Install corridor enhancements including, but not limited <br />to: upgrading lane lines, adjusting median noses, <br />installing accessible pedestrian signals (APS), installing <br />retroreflective backplates, installing mid-block crossing, <br />installing traffic calming measures, installing advanced <br />limit lines at intersections, and installing buffered bike <br />lanes.Y <br />within 5 <br />years $1,070,000 25% $267,500 <br />ATTY/RESO.0088/ CC RESO ADOPTING UPDATED TRANSPORTATION IMPACT FEE PROJECT LIST - EXHIBIT A <br />REV: 11-27-24 MI Page 1 of 5 <br />EXHIBIT A