Laserfiche WebLink
7 El Camino Real, traffic safety improvements within City Limits-Vision Zero <br />project <br />Install corridor enhancements including, but not limited <br />to: upgrading lane lines, bike safety improvements, <br />adjusting median noses, installing retroreflective <br />backplates, installing traffic calming measures, <br />installing advanced limit lines at intersections, and <br />lighting enhancements. Caltrans has a planned <br />installation of a Class IV bikeway along the entire El <br />Camino Real within city limits. The City would install <br />protected intersection treatments and HAWK beacons, <br />where feasible.Y <br />within 10 <br />years $6,000,000 25% $1,500,000 <br />8 Woodside Road, between Hess Road and Kentfield Avenue Install corridor enhancements including, but not limited <br />to: installing retroreflective backplates, installing speed <br />feedback signs, installing advanced limit lines at <br />intersections, and installing bulb outs at unsignalized <br />intersections. Funds would also be used to conduct a <br />complete streets corridor study and coordinate with <br />Caltrans to conduct a bike facility feasibility study. <br />Y <br />within 10 <br />years $2,045,000 25% $511,250 <br />9 Redwood Shores Parkway, between Twin Dolphin Dr and Shoreline Dr-Vision <br />Zero project <br />Install corridor enhancements including, but not limited <br />to: installing wayfinding signage for bikers, installing <br />accessible pedestrian signals (APS), adjusting median <br />noses, installing traffic calming measures, installing <br />advanced limit lines at intersections, installing green <br />bike conflict markings, and tightening curb radii. <br />Y <br />within 10 <br />years $1,220,000 25% $305,000 <br />10 Commuter Ferry Service Construct Ferry Terminal in Redwood City. <br />Y <br />within 5 <br />years $23,760,000 25% $5,940,000 <br />11 Alameda de las Pulgas Corridor Improvements Install pedestrian safety improvements along Alameda <br />de las Pulgas.Y <br />within 5 <br />years $940,000 25% $235,000 <br />12 Caltrain Grade Crossings Conduct environmental review studies for Caltrain <br />grade separation within Redwood City (6 intersections: <br />Maple, Main, Chestnut, Broadway, Brewster, Whipple) <br />Funds would be used for Environmental Review. <br />Y <br />within 5 <br />years $4,000,000 25% $1,000,000 <br />13 Caltrain Grade Crossings Site improvements, bike and ped undercrossing at <br />James, connections to the new transit center.Y <br />10 to 20 <br />years $50,000,000 25% $12,500,000 <br />14 Redwood City Bike Lanes Install bike lanes along roadway segments identified in <br />Redwood City Walk Bike Thrive Plan.Y various years $1,170,000 25% $292,500 <br />15 Redwood City Bike Boulevards Install bike boulevards along roadway segments <br />identified in Redwood City Walk Bike Thrive Plan.Y various years $2,125,000 25% $531,250 <br />16 James Avenue Cycle Track (RWC Transit Center to Elwood Street)Install two-way Class IV cycle track. <br />Y <br />within 5 <br />years $1,160,000 25% $290,000 <br />17 Maple Street Cycle Track (Main Street to El Camino Real)Install two-way Class IV cycle track. <br />Y <br />within 5 <br />years $895,000 25% $223,750 <br />ATTY/RESO.0088/ CC RESO ADOPTING UPDATED TRANSPORTATION IMPACT FEE PROJECT LIST - EXHIBIT A <br />REV: 11-27-24 MI <br /> <br />Page 2 of 5