7 El Camino Real, traffic safety improvements within City Limits-Vision Zero
<br />project
<br />Install corridor enhancements including, but not limited
<br />to: upgrading lane lines, bike safety improvements,
<br />adjusting median noses, installing retroreflective
<br />backplates, installing traffic calming measures,
<br />installing advanced limit lines at intersections, and
<br />lighting enhancements. Caltrans has a planned
<br />installation of a Class IV bikeway along the entire El
<br />Camino Real within city limits. The City would install
<br />protected intersection treatments and HAWK beacons,
<br />where feasible.Y
<br />within 10
<br />years $6,000,000 25% $1,500,000
<br />8 Woodside Road, between Hess Road and Kentfield Avenue Install corridor enhancements including, but not limited
<br />to: installing retroreflective backplates, installing speed
<br />feedback signs, installing advanced limit lines at
<br />intersections, and installing bulb outs at unsignalized
<br />intersections. Funds would also be used to conduct a
<br />complete streets corridor study and coordinate with
<br />Caltrans to conduct a bike facility feasibility study.
<br />Y
<br />within 10
<br />years $2,045,000 25% $511,250
<br />9 Redwood Shores Parkway, between Twin Dolphin Dr and Shoreline Dr-Vision
<br />Zero project
<br />Install corridor enhancements including, but not limited
<br />to: installing wayfinding signage for bikers, installing
<br />accessible pedestrian signals (APS), adjusting median
<br />noses, installing traffic calming measures, installing
<br />advanced limit lines at intersections, installing green
<br />bike conflict markings, and tightening curb radii.
<br />Y
<br />within 10
<br />years $1,220,000 25% $305,000
<br />10 Commuter Ferry Service Construct Ferry Terminal in Redwood City.
<br />Y
<br />within 5
<br />years $23,760,000 25% $5,940,000
<br />11 Alameda de las Pulgas Corridor Improvements Install pedestrian safety improvements along Alameda
<br />de las Pulgas.Y
<br />within 5
<br />years $940,000 25% $235,000
<br />12 Caltrain Grade Crossings Conduct environmental review studies for Caltrain
<br />grade separation within Redwood City (6 intersections:
<br />Maple, Main, Chestnut, Broadway, Brewster, Whipple)
<br />Funds would be used for Environmental Review.
<br />Y
<br />within 5
<br />years $4,000,000 25% $1,000,000
<br />13 Caltrain Grade Crossings Site improvements, bike and ped undercrossing at
<br />James, connections to the new transit center.Y
<br />10 to 20
<br />years $50,000,000 25% $12,500,000
<br />14 Redwood City Bike Lanes Install bike lanes along roadway segments identified in
<br />Redwood City Walk Bike Thrive Plan.Y various years $1,170,000 25% $292,500
<br />15 Redwood City Bike Boulevards Install bike boulevards along roadway segments
<br />identified in Redwood City Walk Bike Thrive Plan.Y various years $2,125,000 25% $531,250
<br />16 James Avenue Cycle Track (RWC Transit Center to Elwood Street)Install two-way Class IV cycle track.
<br />Y
<br />within 5
<br />years $1,160,000 25% $290,000
<br />17 Maple Street Cycle Track (Main Street to El Camino Real)Install two-way Class IV cycle track.
<br />Y
<br />within 5
<br />years $895,000 25% $223,750
<br />ATTY/RESO.0088/ CC RESO ADOPTING UPDATED TRANSPORTATION IMPACT FEE PROJECT LIST - EXHIBIT A
<br />REV: 11-27-24 MI
<br />
<br />Page 2 of 5
|