Laserfiche WebLink
REV: 10-09-24 MI <br />4.Review and respond to contractor Request for Information (RFI). <br />5.Change Order evaluation as necessary. <br />6.Provide support to City inspectors as necessary. <br />7.Architectural Commissioning, including photometric testing, inspection verifying that <br />installed systems are in compliance with project scope, City standards and <br />requirements, and Title 24 compliance. <br />8.Attend construction punch walk and generate project punch list. <br />9.Project Administration as required. <br />10.Provide Conformed Set of Project Documents CAD and PDF format at project <br />completion for City's records. <br />[The remainder of this page left intentionally blank] <br />ATTY/AGR.2024/Amend. No.1/Crosby Engineers Architects, Inc. (As needed architectural design services) (Page 7 of 8)