My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2025.02.08 Special Meeting
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
Agda Pkt 2025.02.08 Special Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2025 4:54:44 PM
Creation date
2/10/2025 4:53:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
2/8/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Completed On Track Delayed <br /> <br />GUIDING PRINCIPLES AND GOALS – FY 2024-25 Mid-Year Progress Page | 32 <br /> <br />Goals Department Quantifiable Measure of <br />Progress <br />(0%, 25%, 50%, 75%, 100%) <br />Update <br />If delayed, include detail as to cause <br />Complete engineering design phase for <br />the following projects aimed at <br />eliminating traffic-related fatalities and <br />severe injuries under the City’s Vision <br />Zero plan by June 2025: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />a) Broadway Complete Streets <br />Project (Walnut Street to <br />Woodside Rd). <br /> <br />ET 75% <br /> <br />Design underway, this design project is being <br />coordinated with some of the current <br />development projects along the project <br />alignment. <br /> <br />b) Vera Avenue Permanent Bicycle <br />Boulevard Project. <br /> <br />ET 95% <br /> <br />Held a community meeting to review the <br />project design in August 2024; design <br />completed. Preparing the Plans, <br />Specifications and Estimates (PS&E) package <br />for construction bidding in April 2025. <br />Awarded TA Cycle 7 Measure A/W grant <br />($1,326,000) for the construction phase. <br />c) Roosevelt Avenue Permanent <br />Traffic Calming Project. <br /> <br />ET 25% <br />Design underway, secured federal grant. <br />d) El Camino Real/James Street <br />Intersection Safety Improvement <br />Project. ET 75% <br />Design underway, awarded Transportation <br />Authority Cycle 7 Measure A/W grant <br />($1,116,000). <br /> <br />5.A. - Page 69 of 75 <br />71
The URL can be used to link to this page
Your browser does not support the video tag.