Laserfiche WebLink
REV: 02-05-25 LF <br />EXHIBIT “A” <br />SCOPE OF SERVICES AND FEE <br />Scope of Services: <br />Contractor will provide annual boiler maintenance services and as-needed work at the <br />request of the Public Works Facilities Superintendent or their designee. <br />Task 1 <br />On-site annual preventative maintenance, full testing, and repair services shall <br />include: <br />•Opening, cleaning and vacuuming fireside of boiler with our power equipment, <br />cleaning furnace, and wire brushing tube sheet (when applicable/accessible). <br />•Opening and cleaning low water cut‐off assemblies. Flushing and resealing waterside <br />(when applicable/accessible). <br />•Vacuuming breeching in immediate vicinity of boiler, where applicable. <br />•Inspecting refractory, point up and wash coat all refractory (when <br />applicable/accessible). <br />•Sealing and closing fireside of boiler. <br />•Supplying new gaskets. <br />•Removing and inspecting main burner (if applicable/accessible) and gas pilot <br />assembly, and adjusting ignition electrode if required. <br />•Reinstalling main burner (if applicable) and gas pilot assembly after inspection in <br />accordance with recommended specification and tolerance. <br />•Checking flame failure safeguard control for pilot and main flame ignition. <br />•Checking operation of blower motor and control circuitry. <br />•Checking operation and adjusting all linkages, belts and pulleys in accordance with <br />factory specifications. <br />•Checking operation of gas valves and vent valves, including all gas train components. <br />•Checking operation of all boiler‐operating controls, limiting pressure controls and <br />running interlocks. <br />•Checking operation of low water controls on hot water closed systems. Drawing <br />down water column and checking low water controls and/or feeding water pump <br />control on steam systems. <br />•Checking burner and pilot and main flame ignition system. <br />•Checking and calibrating each boiler/burner for optimum air/fuel mixture for natural <br />gas, and fine-tune and adjust firing to its maximum efficiency level throughout <br />entire modulation range. Analyze flue gas and monitor temperature, O2, CO2, <br />CO and excess air to be monitored. <br />•Monitor complete combustion and efficiency testing and record at firing rates or <br />20%, 50%, 75% and 100% of boiler/burner capacity when applicable. Calculate and <br />record combustion efficiency at each position. <br />•Submit an engineer’s report to City for review upon completion of full testing. <br />ATTY/AGR.2025.015/Bay City Boiler and Engineering Company, Inc. (Annual Boiler Maintenance and Repair Services) (Page 11 of 13)