My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 Bay City Boiler and Engineering Company, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Under $108K
>
Agmt25 Bay City Boiler and Engineering Company, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2025 3:37:56 PM
Creation date
2/19/2025 3:37:52 PM
Metadata
Fields
Template:
Agreement
RMP File Number
304.5
Date
2/7/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 02-05-25 LF <br />•Perform work Monday through Friday from 7:00am – 4:00pm, such that the City can <br />be notified of any emergency or immediate need for repairs to any of the boilers. <br />Task 2 <br />•Respond to calls for unscheduled work (“Extra Work”) from the City in a timely <br />manner relative to the scale/urgency of the Extra Work. <br />•Extra Work is unscheduled work. The Contractor shall provide any of the services <br />listed above at the request of the Public Works Facilities Superintendent or their <br />designee on a time and material basis. <br />Fees: <br />City shall pay Contractor on a per task basis per the fee schedule below. Task 1 will be <br />performed once annually at each facility at a total fixed cost of $16,135. Annual services <br />performed under Task 1 shall be invoiced by facility. Contractor must provide the facility <br />inspection report with each invoice to demonstrate completion. Invoices shall be billed <br />with Net 30 payment terms, in a form consistent with Section 6, Compensation. <br />Task 2 will be performed on an as-needed basis at an hourly rate with a percentage mark- <br />up applied to materials costs for a total amount not to exceed $82,865. Invoices shall be <br />billed monthly with Net 30 payment terms, in a form consistent with Section 6, <br />Compensation. <br />Task 1 <br />Facility Address Equipment <br />Manufacturer <br />Model Serial Number Annual Cost <br />Police <br />Facility 1301 Maple Rite Boiler 200 23165 $2,460.00 <br />City Hall 1017 <br />Middlefield Raypak H7-1507 V402300498 $2,675.00 <br />Main Library 1044 <br />Middlefield Riello AR-1000 FC19Q002596 $2,480.00 <br />Red Morton <br />Community <br />Center <br />1120 <br />Roosevelt Camus DFNH-0751- <br />MGI 071827125 $3,030.00 <br />Public Works <br />Services <br />(MSC) <br />1400 <br />Broadway Rite Boiler 10555 24781 $2,460.00 <br />Redwood <br />Shores <br />Library <br />399 Marine <br />Parkway Camus DFNH 1102 110705969 $3,030.00 <br />Total Annual Cost $16,135.00 <br />ATTY/AGR.2025.015/Bay City Boiler and Engineering Company, Inc. (Annual Boiler Maintenance and Repair Services) (Page 12 of 13)
The URL can be used to link to this page
Your browser does not support the video tag.