Laserfiche WebLink
21 <br />2 Heating devices within Overhead Structures <br />shall meet requirements on Section 4A, <br />Part VII. All heating devices require 5’ clear <br />above and 10’ clear all around, free of <br />combustibles. <br />3 Overhead structures and their supporting <br />infrastructure shall not be bolted or <br />affixed in any way to the Roadway, <br />sidewalks, curbs, fire hydrants, street <br />trees, streetlights, parking meters, <br />or traffic poles. Overhead Structures <br />proposed to be affixed to adjacent <br />structures or buildings shall include all <br />necessary details on the plans to show how <br />it is attached, which will be reviewed during <br />plan check. <br />Diagram 12: Overhead Structure over Roadway Parklet <br />Diagram 13: Overhead Structure over Building-Adjacent Parklet <br />ATTY/RESO.0017/CC RESO OUTDOOR BUSINESS ACTIVITY PROGRAM GUIDELINES - EXHIBIT A <br />REV: 03-03-25 JB <br /> <br />Page 24 of 34