My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2025.03.10 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
Agda Pkt 2025.03.10 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2025 2:48:55 PM
Creation date
3/11/2025 2:44:20 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/10/2025
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
3/11/2025 2:48 PM
Modified:
3/11/2025 2:48 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
715
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 4 of 5 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />Table 1: Veterans Boulevard Sanitary Sewer Replacement Phasing Plan Timeline <br />As of January 17, 2025, the Contractor resolved all punch-list items for both the Emergency Veterans <br />Boulevard Sanitary Sewer Repairs and Replacement Project (Phase 2) and the supplemental 2024 <br />Emergency Veterans Boulevard Sewer Replacement Project contracts. All scoped work and repairs have <br />been completed to the satisfaction of the City. Engineering staff recommends the final acceptance of <br />work, the release of all bonds and retention, and the filing of notices of completion. <br />FISCAL IMPACT <br />There is no General Fund impact associated with these contracts. Funds for Veterans Boulevard Sanitary <br />Sewer Repairs and Replacement Project (Phase 2) and the supplemental 2024 Veterans Boulevard <br />Sanitary Sewer Emergency Repairs were appropriated in the Fiscal Year 2023-24 budget Fund 689 for <br />Sewer Fund Capital Projects – Collection System Replacement Program with an available balance of <br />$7,221,145 as of January 17, 2025. <br />ENVIRONMENTAL REVIEW <br />This activity is not a project under California Environmental Quality Act (CEQA) as defined in CEQA <br />Guidelines, section 15378, because it has no potential for resulting in either a direct or reasonably <br />foreseeable indirect physical change in the environment. <br />PUBLIC NOTICE <br />Public notification was achieved by posting the agenda, with the agenda items being listed, at least 72 <br />hours prior to the meeting. <br />6.B. - Page 4 of 5 <br />65
The URL can be used to link to this page
Your browser does not support the video tag.