My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2009-11-30 clsd, spc
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2009
>
AgdaPkt 2009-11-30 clsd, spc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2009 3:24:43 PM
Creation date
11/25/2009 3:22:37 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
11/30/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.18 <br />Page 1 <br /> <br />REPORT <br /> <br />To the Honorable Mayor and City Council <br />From the Ci Mana er <br /> <br />November 30, 2009 <br /> <br />SUBJECT <br />Additional Construction Budget Request - Redwood City Recycled Water Project - <br />Phase I - Redwood Shores Customer Site Retrofits - Bid Package 3 <br /> <br />RECOMMENDATION <br />By motion, authorize the City Manager to increase the contract amount up to 20%, as <br />necessary to complete the construction of this project that was awarded to Valley Crest <br />Landscape Maintenance Inc. <br /> <br />BACKGROUND <br />On June 22, 2009 the City Council awarded the Contract for the Redwood City <br />Recycled Water Project - Phase I - Redwood Shores Customer Site Retrofits - Bid <br />Package 3 project to the lowest responsible bidder, Valley Crest Landscape <br />Maintenance Inc. of San Jose for their low bid of $211,483.00 and authorized the City <br />Manager to increase the contract amount up to 10% if necessary. <br /> <br />Five bids were received at the bid opening on May 14, 2009. The low bid of <br />$211,483.00 from Valley Crest Landscape Maintenance Inc. was 450/0 lower than the <br />engineer's estimate of $385,000.00 for the cost of construction. <br /> <br />This customer site retrofit project (Retrofit Bid Package 3) is the third retrofit project <br />designed to extend the delivery of recycled water for new commercial irrigation, city <br />roadway landscaping, and to common areas of home owners associations in Redwood <br />Shores. The project consists of converting 20 existing irrigation systems from potable <br />water to recycled water. <br /> <br />As of October 23, 2009, Retrofit Bid Package 3 is 94% complete and one city requested <br />change order totaling $21,096.00 has been issued which approaches the maximum <br />amount the City Manager may authorize in excess of the contract amount. The <br />additional work was to retrofit two irrigation systems in the common areas of the Harbor <br />Court Homeowner Association located along Shearwater Parkway from potable water <br />to recycled water. Harbor Court has worked with the City over the past several months <br />to prepare their site for the recycled water conversion. Supplying the Harbor Court site <br />results in an immediate savings of 4 AF/yr, or approximately 3,500 gallons per day, of <br />potable water demand in the current irrigation season. Harbor Court is the third <br />homeowner association in RWS to receive recycled water as part of this project. <br /> <br />More recently, at a retrofit site known as the Westport Office complex, the contractor <br />discovered site conditions that warrant a second change order. The contractor <br />
The URL can be used to link to this page
Your browser does not support the video tag.