Laserfiche WebLink
<br /> <br />8 <br /> <br /> Figure 1 - 901 El Camino Real <br /> Figure 2 - 920 Shasta St. <br /> <br />2.2 Projected Water Demand for the Proposed Project <br />Water demand projections for the Proposed Project were developed using Attachment Q of Volume III (Design <br />Criteria) of Redwood City’s 2019 Engineering Standards (included in Appendix A of this WSA). The water demand <br />projections for the Proposed Project include both potable and recycled water uses to conform to the <br />requirements of Redwood City’s Municipal Code. According to Redwood City’s Municipal Code Section 38.52, all <br />new commercial and multi-family residential properties located within the City’s recycled water service area <br />ATTY/RESO.0027/CC RESO WATER SUPPLY ASSESSMENT (920 SHASTA) - EXHIBIT A <br />REV: 04-22-25 VR <br /> <br />Page 8 of 42