ATTY/RESO.0029/CC RESO APPROVING ARCHITECTUAL PERMIT, TENTATIVE PARCEL MAP (920 SHASTA) – EXHIBIT A <br />REV: 04-22-25 VR <br />Page 17 of 22 <br />i. If use of Tier 4 equipment is not available, use alternative equipment that meets <br />U.S. EPA emission standards for Tier 4 interim standards that altogether achieve <br />a 70 percent reduction in particulate matter exhaust in comparison to <br />uncontrolled equipment; alternatively (or in combination). <br />ii. Installation of electric power lines during early construction phases to use <br />electric generators and welders. <br />b. Alternatively, the applicant may develop another construction operations plan <br />demonstrating that the construction equipment used on-site would achieve a <br />reduction in construction diesel particulate matter emissions by 70 percent or greater. <br />Elements of the plan could include a combination of some of the following measures: <br />c. Implementation of a) above to use Tier 4 or alternatively fueled equipment, <br />d. Installation of electric power lines during early construction phases to avoid use of <br />diesel generators, welders, and compressors, <br />e. Use of electrically powered equipment, <br />f. Forklifts and aerial lifts used for exterior and interior building construction shall be <br />electric or propane/natural gas powered, <br />g. Change in construction build-out plans to lengthen phases, and <br />h. Implementation of different building techniques that result in less diesel equipment <br />usage. <br />i. Such a construction operations plan would be subject to review by an air quality expert <br />and approved by the City prior to construction.” [Focused General Plan Update EIR <br />Mitigation Measure AIR-2] [Planning] <br />75. Construction Sign - Prior to building permit issuance, the Applicant shall install and provide <br />photo verification of at least one 36” x 48” (minimum) construction sign in a visible location <br />along the project frontage for the duration of construction. The sign shall include, at <br />minimum, the following information: project name & address, elevation or rendering, <br />construction manager (name, phone number), anticipated completion (season, year), and <br />the City’s permitting website http://permits.redwoodcity.org.[COA][PLANNING] <br />76. Construction Meetings – The Applicant is required to contact the Permit Counter <br />(650.780.7350) to schedule the following meetings prior to or during construction. <br />[COA][BUILDING] <br />a. Pre-Grading - Prior to the issuance of any grading permits, the Applicant shall ensure <br />all construction crews undergo a training session to inform them: 1) of the potential <br />for previously undiscovered human remains or presence and identification of federal <br />or state-eligible cultural resources within the Project area, 2) of the laws protecting <br />these resources and associated penalties, and 3) of the procedures to follow should <br />they discover human remains or cultural resources during Project related work (Refer <br />to COA no. 86.) [General Plan EIR Mitigation Measures 4.5-1b & 3b] [COA][Planning] <br />