My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso25 16296
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2020-2029
>
2025
>
Reso25 16296
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 3:59:13 PM
Creation date
4/29/2025 3:56:21 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
4/28/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5 <br />22206 920 Shasta <br />Affordable Housing Plan and Density Bonus Request <br />November 5, 2024 <br />The property has “clear” title. A title report dated July 31, 2024 has been submitted to the City for <br />review. The title reports show that there are no liens securing the repayment of debt or any other <br />security instrument. There are no minor encumbrances, should any exist, these shall be removed to <br />satisfaction of the City at the time of property transfer to Qualifying Designee or the City. The City shall <br />have sole and absolute discretion to approve the condition of title. The standard land donation <br />requirement is that the property is vacant undeveloped property; except that the City, at its sole and <br />absolute discretion, may accept property with existing improvements, so long as the donor takes all <br />necessary steps to avoid impacts on residents of existing residential structures. <br />In the event that the City needs to take possession of the land, Abode will agree to deliver the <br />Affordable Project site vacant at the City’s request. There are currently an existing 3-bedroom single- <br />family home and a 2-bedroom caretaker's residential unit occupied on the property as well as an <br />operating self-storage facility. All leases, including the ones for the public storage facility are month- <br />to-month. The residential leases are cancelable by the owner. The public storage is owner operated <br />and will cease operations upon notice, allowing sufficient time to terminate the month-to-month <br />storage leases. The applicant acknowledges that the land donor must provide a tenant relocation plan <br />and payment of relocation benefits. (Relocation benefits to tenants shall be provided in accordance <br />with the California Relocation Assistance Act, as codified Government Code 7260 et seq and the <br />implementing regulations at 25 California Code of Regulations Sections of 26 6000 et seq. The <br />Relocation Plan is subject to review and approval by the City prior to or concurrently with the <br />resolution approving the acceptance of the land to be donated (i.e., at entitlement approvals and not <br />prior to land transfer. Below is a summary of relocation actions. <br />Abode Communities has a contract with a Relocation Consultant for ongoing consultation as well as <br />relocation services. A draft Relocation Plan has been prepared and submitted to the City for review; <br />the plan complies with the California Relocation Assistance Act. The affordable housing developer <br />will indemnify the City pursuant to City Zoning Code Section 29.8H(9 requirements. Residential <br />tenants will be notified about the relocation plan with at least 12 months’ notice, with additional 180- <br />day, 90-day and 30-day notices. Overland Pacific & Cutler, LLC (a division of Transystems will be <br />responsible for the relocation of both residential and commercial tenants under the direction of <br />Abode Communities. Relocation is expected to begin at 6 months of receipt of a tax credit award. The <br />site is expected to be unoccupied/vacant for the last 3 months prior to receiving all financial <br />commitments and construction commencement. <br />The Affordable Housing Project will require demolition of existing structures. Abode Communities will <br />be responsible for submitting a demolition plan within 6-months of closing escrow of financing for <br />review and approval by the City. The demolition plan should be approved upon closing escrow on <br />financing. <br />The property will provide adequate utilities and infrastructure. The Affordable Project site already has <br />existing development on it. It is well served by existing utilities. The Project site will continue to have <br />adequate utilities, streets, public facilities, and other infrastructure to accommodate affordable units. <br />A Utility Report dated 6/16/2023 has been submitted to the city. <br />The Applicant acknowledges that the property must be free of hazardous materials or other material <br />environmental constraints to development of affordable housing. <br />ATTY/RESO.0029/CC RESO APPROVING ARCHITECTUAL PERMIT, TENTATIVE PARCEL MAP (920 SHASTA) – EXHIBIT B <br />REV: 04-22-25 VR <br /> <br />Page 5 of 29
The URL can be used to link to this page
Your browser does not support the video tag.