Laserfiche WebLink
<br /> <br /> <br />145 <br /> <br />Prior EIR Determination Effect <br />Peculiar to <br />Project <br />Site? <br />New <br />Significant <br />Effect? <br />New Significant <br />Off-Site, <br />Cumulative <br />Impact? <br />New <br />Information, <br />More Severe <br />Adverse <br />Impact? DTPP EIR <br />DTPP Plan- <br />Wide <br />Amendments <br />SEIR <br />Focused <br />GPU <br />EIR <br />XX. WILDFIRE – If located in or near state responsibility areas or lands classified as very high fire hazard severity zones, <br />would the project: <br />a) Substantially impair an adopted emergency <br />response plan or emergency evacuation plan? <br />Not <br />Addressed LTS LTS No No No No <br />b) Due to slope, prevailing winds, and other <br />factors, exacerbate wildfire risks, and thereby <br />expose project occupants to pollutant <br />concentrations from a wildfire or the <br />uncontrolled spread of a wildfire? <br />Not <br />Addressed LTS LTS No No No No <br />c) Require the installation or maintenance of <br />associated infrastructure (such as roads, fuel <br />breaks, emergency water sources, power lines <br />or other utilities) that may exacerbate fire risk <br />or that may result in temporary or ongoing <br />impacts to the environment? <br />Not <br />Addressed LTS LTS No No No No <br />d) Expose people or structures to significant <br />risks, including downslope or downstream <br />flooding or landslides, as a result of runoff, <br />post-fire slope instability, or drainage <br />changes? <br />No Impact No Impact No <br />Impact No No No No <br /> <br />Documentation: <br /> <br />Commercial Component: <br />a. The DTPP Final EIR did not analyze the impacts on the DTPP as it relates to wildland fire as that was not a part of <br />the CEQA Guidelines Appendix G at the time. THE DTPP Plan-Wide Amendments SEIR found impacts related to <br />wildfire to be less than significant. As discussed above in item VIII, Hazards and Hazardous Materials, the project <br />component would not impair or interfere with emergency access or impair emergency response and evacuation in the <br />Precise Plan area (also see item XV, Public Services). Thus, this impact is less than significant. The Commercial <br />Component would not generate new or more severe impacts beyond those analyzed in the SEIR, and there is no new <br />information of substantial importance for CEQA purposes. <br />b. and c. The DTPP Final EIR did not analyze the impacts on the DTPP as it relates to wildland fire. THE DTPP Plan- <br />Wide Amendments SEIR found impacts related to wildfire to be less than significant. The DTPP area is not in a Very <br />High Fire Severity Hazard Zone or a State Responsibility Area, and there are no high fire hazard areas or wildlands <br />susceptible to wildfire in the project vicinity. No wildfire-related infrastructure would be necessary. Impacts related <br />to wildfire or installation and/or maintenance of wildfire-related infrastructure would be less than significant (DTPP <br />Plan-Wide Amendments program SEIR p. 18-830). The proposed Commercial Component would not generate new or <br />more severe impacts beyond those analyzed in the SEIR, and there is no new information of substantial importance <br />for CEQA purposes. <br />d. The DTPP program EIR (pp. 10-25 through 10-27) determined that no impacts associated with the Commercial <br />Component would occur related to flooding, seiche, tsunami, and mudflow/debris flow, and no mitigation is required. <br />The DTPP Plan-Wide Amendments program SEIR (pp. 10-3 and 10-42) concurred with the DTPP EIR conclusion. <br />The proposed Commercial Component would not expose people or structures to significant risks, including downslope <br />or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes. The <br />Commercial Component would not generate new or more severe impacts beyond those analyzed in the SEIR, there is <br />no new information of substantial importance for CEQA purposes. <br /> <br /> 30As noted in the DTPP Plan-Wide Amendments program SEIR, at the time the DTPP EIR was prepared, Wildfire was not <br />a topic included in the CEQA Guidelines Appendix G. <br />ATTY/RESO.0031/CC RESO CEQA GUIDELINES (901 EL CAMINO REAL) <br />REV: 04-22-25 VR <br /> <br />Page 145 of 148