My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso25 16298
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2020-2029
>
2025
>
Reso25 16298
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 4:06:01 PM
Creation date
4/29/2025 4:05:01 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
4/28/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />64 <br />program EIR p. 16-1). The Commercial Component site is not within an Alquist-Priolo Earthquake Fault Zone (DTPP <br />program EIR p. 16-1); therefore, there is no known potential for fault rupture on the site. The Commercial Component <br />would not create new impacts or increase impacts, and there is no new information of substantial importance for <br />CEQA purposes. <br />ii) and (iii) The Commercial Component site lies in a seismically active region and is subject to ground shaking from <br />an earthquake along major active regional faults. This is common to virtually all development in the San Francisco <br />Bay Area. Development on the site would be subject to review and approval by the City and shall be designed and <br />constructed in accordance with all applicable seismic standards adopted by the City of Redwood City, including the <br />California Building Code (CBC) and/or California Historical Building Code (CHBC), which require that a site- <br />specific geotechnical investigation be conducted and an accompanying report be prepared by a licensed professional. <br />The site-specific geotechnical report must provide measures to reduce potentially significant geologic hazards (e.g., <br />expansive and corrosive soils, differential settlement, and slope instability). The geotechnical report is subject to City <br />Building Official approval prior to the issuance of grading and building permits (DTPP program EIR p. 16-4). The <br />required contents of the geotechnical report are described in DTPP program EIR Mitigation 16-1 and EIR page 16-6, <br />and also in DTPP Plan-Wide Amendments program SEIR Mitigation GEO-4a and SEIR pages 16-10 and 16-12. <br />Mitigations 16-1 and GEO-4a reiterate the uniformly applicable policies and regulations already adopted by the City. <br />Techniques and standards for effective geotechnical practices are widely known and accepted. Individual measures <br />for specific sites and projects are typically specified at a detailed level of design. The City routinely requires such <br />geotechnical/geologic investigations and specifications, and a significant record exists demonstrating the effectiveness <br />of such design and engineering requirements in adequately addressing potential soil and geologic issues. Under the <br />City’s grading permit and building permit regulations, an individual development project cannot be given final <br />approval without project compliance with geotechnical/geologic requirements. These requirements and related City <br />inspection and verification procedures before project occupancy provide reasonable assurance that the project <br />component will incorporate the necessary design and engineering refinements. <br />A site-specific geotechnical report was prepared for the proposed Commercial Component as required by DTPP <br />program EIR Mitigation Measure 16-1 (Geotechnical Investigation, Proposed Office Building and Teen Center, 901 <br />El Camino Real, Redwood City, California; Rockridge Geotechnical; August 7, 2024). The report provides <br />preliminary conclusions and recommendations regarding the following site-specific geotechnical issues: <br /> shallow groundwater relative to the proposed building foundation and excavation depth; and <br /> providing suitable lateral support and dewatering for the proposed excavation, while minimizing impacts to the <br />surrounding improvements. <br />The above interrelated issues are detailed in the geotechnical report, which also includes the technical data and analysis <br />of one near-surface soil sample and four cone penetration tests (CPTs) performed by Romig on the Commercial <br />Component site on May 31, 2019, and more recent subsurface data gathered by Rockridge Geotechnical from three <br />CPTs and two hand-auger borings, performed on June 15, 202 and June 24, 2022 respectively. The professional, <br />engineering-level discussion of the issues noted above is included in the original report by Rockridge Geotechnical <br />(August 7, 2024). <br />Consistent with DTPP EIR Mitigation Measure 16-1 and DTPP Plan-Wide Amendments SEIR Mitigation Measure <br />GEO-4a, the geotechnical report recommends site-specific solutions to the identified Commercial Component-specific <br />issues and concerns, including: <br /> site seismicity and seismic hazards, including the potential for liquefaction and lateral spreading, and total and <br />differential settlement resulting from liquefaction and/or cyclic densification; <br /> the most appropriate foundation type(s) for the proposed building, including tiedown (soil) anchors to resist <br />hydrostatic uplift; <br /> design criteria for the recommended foundation type(s), including vertical and lateral capacities for each of the <br />foundation types; <br /> estimates of foundation settlement; <br /> design groundwater elevation; <br /> lateral earth pressures for design of retaining walls; <br /> site preparation and grading, including criteria for fill quality and compaction; <br />ATTY/RESO.0031/CC RESO CEQA GUIDELINES (901 EL CAMINO REAL) <br />REV: 04-22-25 VR <br /> <br />Page 64 of 148
The URL can be used to link to this page
Your browser does not support the video tag.