Laserfiche WebLink
ATTY/RESO.0034/CC RESO APPROVING PROJECT (901 EL CAMINO REAL) – EXHIBIT A <br />REV: 04-22-25 VR <br />Page 6 of 28 <br />Harvey and Associates dated October 7, 2024 which includes the tree number, type, and <br />location. [SDR][PLANNING] <br />25. Street Trees - A total of 37 (24-inch box) street trees shall be planted by the Applicant along <br />the El Camino Real (12), James Street (10), Winklebleck Street and Franklin Street (15) <br />frontages as well as an additional 5 trees in the plaza and 39 trees in the creek area, for a <br />grand total of 81 trees. The tree species and location will be determined by the City <br />Engineer and Parks and Recreation Director. These improvements shall be included as part <br />of the building permit submittal package. Newly planted trees shall follow the City’s street <br />tree planting standards and be both irrigated and maintained by the Applicant in a manner <br />consistent with the Landscape Maintenance Agreement. [SDR][PLANNING] <br />26. Stormwater Runoff - Post-construction runoff into the storm drain from the Project site <br />shall not exceed pre-construction runoff levels. The Applicant’s design professional shall <br />evaluate the Project’s impact to the City’s storm drainage system and shall substantiate <br />their conclusions with drainage calculations to the satisfaction of the City Engineer prior to <br />building permit issuance. The Project shall be designed in conformance with the Drainage <br />Guidelines for Commercial Development. [SDR] [ENGINEERING] <br />27. Exterior Lighting – The Applicant shall provide a lighting plan for proposed exterior lighting, <br />including cut sheets, a photometric site plan demonstrating light levels, and a diagram <br />showing light spillover. This information shall be included in the building permit plans. New <br />light sources must not introduce glare or light effects that spill off the property. <br />[COA][PLANNING] <br />28. Bicycle Parking – The Applicant has proposed to provide for a total number of (32) short- <br />term and (132) long-term secure bicycle parking spaces for the Project and is required by <br />the DTPP to provide (31) short-term and (125) long-term secure bicycle parking spaces. <br />Long-term bicycle parking should be available for use by both the office tenants and staff <br />as well as the Teen Center staff and visitors. It is recommended that each land use have its <br />own bicycle parking spaces. The proposed bicycle parking spaces shall be demonstrated on <br />the building permit plans which shall be subject to review and approval by the City Engineer. <br />[COA][ENGINEERING] <br />29. Electric Vehicle Charging Stations – The Applicant shall provide and install 93 Level 2 EV <br />Capable and 62 Level 2 EV CS Charging Stations with at least 2 being van accessible, <br />including considerations of signage and time limits if applicable. The Applicant shall <br />demonstrate this on the building permit plans, which shall be subject to review and <br />approval by the City Engineer. [COA][ENGINEERING] <br /> <br />30. El Camino Real and James Avenue Intersection Improvements – Prior to issuance of the <br />building permit, the Applicant shall update the construction plans to demonstrate that the <br />design is consistent with the City’s current El Camino Real and James Avenue Intersection <br />Improvement Project. If the City’s project has not been awarded for construction prior to <br />building permit issuance, the Project shall be responsible for construction of compliant curb