My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso25 16301
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2020-2029
>
2025
>
Reso25 16301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 4:12:53 PM
Creation date
4/29/2025 4:10:01 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Date
4/28/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0034/CC RESO APPROVING PROJECT (901 EL CAMINO REAL) – EXHIBIT A <br />REV: 04-22-25 VR <br />Page 7 of 28 <br />ramps and crosswalks. At a minimum, the curb ramps at the project corner and two <br />receiving corners of El Camino Real and James Avenue intersection, and associated <br />crosswalks, shall be replaced if the existing ramps do not comply with applicable, current, <br />standards, including but not limited to City’s Engineering Standards and accessibility <br />requirements. At a minimum, the two adjacent crosswalks at this intersection shall be <br />upgraded to high-visibility crosswalks. [COA] [ENGINEERING] <br />31. James Avenue Improvements - Prior to the issuance of building permit, the Applicant shall <br />submit improvement plans showing improvements on James Avenue, per the following <br />scenarios: <br />• If the Building Permit for the adjacent development responsible for widening James <br />Avenue has been issued prior to building permit issuance for 901 El Camino Real, the <br />adjacent development shall be responsible for re-grading and widening the whole stretch <br />of James Avenue between new Franklin Street and El Camino Real and the Applicant shall <br />be responsible for constructing the bike facility as follows: <br />o 901 ECR improvement plans shall show and the Applicant shall construction a <br />two-way 6’ wide cycle track, on north side of the street, on James Avenue, <br />protected by a 3’ wide concrete median. The vehicular travel lanes shall be three <br />10’ wide lanes for the north bound through lane, the south bound left turn lane, <br />and the south bound through/right turn lane. <br />• If the Building Permit for the adjacent development responsible for widening James <br />Avenue has not been issued, the Applicant is responsible for regrading and constructing <br />a one-way bike facility at their frontage as follows: <br />o The 901 El Camino Real improvement plans shall show and the Applicant shall <br />construct one 6’ wide bike lane, on the north side of the street, protected by <br />striping and a physical barrier subject to approval of the City Engineer, with the <br />remaining street width being configured into vehicle travel lanes to the <br />satisfaction of the City Engineer in accordance with applicable Engineering <br />Standards. <br />32. Discards Collection - Prior to the issuance of a building permit, the Applicant shall submit <br />to Engineering a Discards Collection Plan for review and approval. The plan shall include the <br />following elements and additional elements as required by City staff: [COA][ENGINEERING] <br />• Maintenance and Service: Trash, recycling, and compositing (Discards) storage <br />areas shall include adequate space for the maintenance and servicing of <br />containers for all materials that are provided by local hauling companies. <br />• Adequate Space for Trash, Recyclables, and Compostables: The amount of space <br />provided for the collection and storage of recyclable materials shall be at least as <br />large as the amount of space provided for the collection and storage of trash
The URL can be used to link to this page
Your browser does not support the video tag.