My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso25 16301
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2020-2029
>
2025
>
Reso25 16301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 4:12:53 PM
Creation date
4/29/2025 4:10:01 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Date
4/28/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0034/CC RESO APPROVING PROJECT (901 EL CAMINO REAL) – EXHIBIT A <br />REV: 04-22-25 VR <br />Page 12 of 28 <br />requirements, in accordance with the City's Engineering Standards and as directed by the <br />City Engineer. New water mains shall be 8” minimum in size and extend across the entire <br />property frontage, from the nearest point of connection to an existing 6” or larger water <br />main. As a part of the Project’s realignment of the streets, new 8” water mains shall be <br />installed on James Avenue, and new Franklin Street. Prior to the issuance of building permit, <br />the Applicant shall submit improvement plans showing improvements on James Avenue, <br />per the following scenarios: <br />• If the Building Permit for the adjacent development responsible for extending an 8” <br />watermain from the end of the existing 8” main to the 12” watermain in El Camino Real <br />has been issued prior to building permit issuance for 901 El Camino Real, the adjacent <br />development shall be responsible for said watermain extension and the Applicant shall <br />be responsible for constructing the watermain in James as follows: <br />o 901 ECR improvement plans shall show and the Applicant shall construct a new 8” <br />watermain from the intersection of new Franklin to the point of connection to the <br />watermain to be installed by the adjacent development (approximately 180 LF), to <br />the satisfaction of the City Engineer in accordance with applicable Engineering <br />Standards. <br />• If the Building Permit for the adjacent development responsible for extending an 8” <br />watermain from the end of the existing 8” main to the 12” watermain in El Camino Real <br />has not been issued, the Applicant is responsible for said watermain extension as <br />follows: <br />o The 901 El Camino Real improvement plans shall show and the Applicant shall <br />construct a new 8” watermain extending from the intersection of new Franklin to <br />the 12” watermain in El Camino Real (approximately 355 LF) to the satisfaction of <br />the City Engineer in accordance with applicable Engineering Standards. <br />46. Water Meters – The Project is limited to one “master” water meter for domestic water <br />service. Any metering for individual units must be accomplished by private sub-meters <br />within the property. [COA][ENGINEERING] <br /> <br />47. Recycled Water Facilities – Recycled water (purple pipe) facilities shall be provided and <br />designed by the Applicant in accordance with Engineering Standards for dual plumbing, <br />irrigation, and other warranted uses per the Recycled Water Ordinance, Chapter 38. <br />Services that are to be supplied by recycled water (either at the time of project completion <br />or at a future date) shall be designed to properly function at the design pressure required <br />by Engineering. Upon a final determination by the City that recycled water is available for <br />the property, the Applicant shall connect the Project to the recycled water system. Pipe <br />material for internally dual plumbed systems intended for the conveyance of recycled water <br />shall be constructed of non-metallic materials as allowed in the California Plumbing Code, <br />and in accordance with the City’s Customer Guidelines for Recycled Water Use. If recycled <br />water is not available for the property, the Applicant shall extend off-site recycled water <br />infrastructure to the property to the satisfaction of the City Engineer in accordance with
The URL can be used to link to this page
Your browser does not support the video tag.