My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso25 16301
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2020-2029
>
2025
>
Reso25 16301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 4:12:53 PM
Creation date
4/29/2025 4:10:01 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Date
4/28/2025
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
4/29/2025 4:12 PM
Modified:
4/29/2025 4:12 PM
Text:
https://library.municode.com/ca/redwood_city/codes/city_code?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.240STIMTR
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
4/29/2025 4:12 PM
Modified:
4/29/2025 4:12 PM
Text:
https://library.municode.com/ca/redwood_city/codes/city_code?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.240STIMTR
ID:
3
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
4/29/2025 4:12 PM
Modified:
4/29/2025 4:12 PM
Text:
https://library.municode.com/ca/redwood_city/codes/city_code?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.240STIMTR
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0034/CC RESO APPROVING PROJECT (901 EL CAMINO REAL) – EXHIBIT A <br />REV: 04-22-25 VR <br />Page 14 of 28 <br />• Treatment Measure Inspection – The Applicant shall coordinate installation of <br />stormwater treatment measures with the municipality, shall arrange to have the <br />City’s designated inspector present at the time of installation, and shall have the <br />City’s designated inspector complete a final inspection of installed stormwater <br />treatment measure immediately after installation is complete. <br />54. Stormwater Management Plan (SWMP) – The Applicant shall prepare a SWMP that <br />includes, at a minimum, exhibit(s) showing drainage areas and location of Low Impact <br />Development (LID) treatment measures; total project site area and total area of land <br />disturbed; total new and/or replaced impervious area; treatment measures and hydraulic <br />sizing calculations; a listing of source control and site design measures to be implemented <br />at the site; saturated hydraulic conductivity rate(s) at relevant locations or hydrologic soil <br />type (A, B, C or D) and source of information; elevation of high seasonal groundwater table; <br />and a brief summary of how the Project is complying with Provision C.3 of the MRP. <br />[COA][ENGINEERING] <br />55. Construction General Permit – For construction activity resulting in a land disturbance of <br />one acre or more, the Applicant shall file a Notice of Intent (NOI) with the State Water <br />Resources Control Board under the Construction Activities Storm Water General Permit <br />(General Permit). The NOI indicates the Applicant’s intent to comply with the San Mateo <br />Countywide Stormwater Pollution Prevention Program, including a Stormwater Pollution <br />Prevention Plan (SWPPP). [SDR] [ENGINEERING] <br />56. Stormwater BMPs - Stormwater Pollution Prevention Program Best Management Practices <br />(BMPs) for construction shall be implemented by the Applicant to protect water quality, in <br />accordance with the approved Stormwater Pollution Prevention Plan (SWPPP). BMP plan <br />sheets are available electronically for inserting into project plans. [SDR][ENGINEERING] <br />Street Infrastructure Improvements <br /> <br />57. Streetlights - The Applicant shall install a new streetlight, if needed, as determined by the <br />City Engineer. Streetlights are required on the construction of a new commercial building <br />or performance of substantial commercial remodeling with street frontage of 200 feet or <br />more. The style and location of all streetlights shall be as determined by the City Engineer <br />and Planning Manager. [SDR][ENGINEERING] <br /> <br />58. Green Infrastructure Improvements – The Applicant shall include stormwater treatment <br />systems, including but not limited to Silva Cells, at the project frontages along James <br />Avenue, Winklebleck Street, new Franklin Street and El Camino Real. The treatment <br />systems shall be sized to treat the half-street tributary area of the project frontage. <br />[SDR][ENGINEERING] <br />59. Repair or Replace Street Infrastructure – The Applicant shall restore streets and street <br />infrastructure surrounding the project site to the satisfaction of the City Engineer at project <br />completion. At the minimum, this shall mean grind and overlay of half width of the frontage
The URL can be used to link to this page
Your browser does not support the video tag.