ATTY/RESO.0034/CC RESO APPROVING PROJECT (901 EL CAMINO REAL) – EXHIBIT A <br />REV: 04-22-25 VR <br />Page 16 of 28 <br />type(s) of construction, occupancy separations or non-separated occupancy, number of <br />stories, exterior opening analysis, maximum height above grade plane, floor area per floor <br />and total floor area, use or process hazards, and presence of and design standard for <br />automatic sprinklers. This includes clearly addressing all assembly occupancies within the <br />building and their requirements. [CBC §107.2.1] [COA][FIRE] <br /> <br />65. Pre-submittal Meetings - This is a substantial Project for which the Fire Department highly <br />recommends the Applicant’s design team schedule pre-submittal meeting(s) to discuss <br />code issues that may arise as the design is being finalized. To schedule these meetings <br />please reach out to the Fire Marshal (Janice Cheung at jcheung@redwoodcity.org). Prior to <br />the meeting, the Applicant should prepare a clear list of questions with references to <br />specific code requirements. [Recommendation][FIRE] <br /> <br />66. Scope & Sequencing - The building permit plans should clearly note what the scope of work <br />encompasses. If multiple phases will be constructed the description of work to be <br />performed in each phase should be noted. If items are to be deferred, this should be clearly <br />noted on the plans. [CBC §107.3.3 & 107.3.4.1] [COA][FIRE] <br /> <br />67. Fire Apparatus Access - All portions of the exterior of the building are required to be <br />accessible and within 150-feet of the fire apparatus access road. [FIRE] [CFC §503.1.1] <br /> <br />68. Aerial Fire Apparatus Access Road (Sheets G4.04, C7.0, C11.0 and L0.01) - Where the <br />vertical distance between the grade plane and the highest roof surface exceeds 30-feet, an <br />aerial fire apparatus access road is required. [CFC Appendix D§105.1] This building is greater <br />than 30-feet tall, and therefore an aerial (ladder truck) fire access road is required. <br /> <br />• Width: The aerial fire apparatus access road shall have a minimum unobstructed <br />width of 26-feet, exclusive of shoulders, in the immediate vicinity of the building. [CFC <br />Appendix D§105.2] <br />• Proximity to Building: One or more of the required access routes meeting this <br />condition shall be located not less than 15-feet and not greater than 30-feet from the <br />building and shall be positioned parallel along the longest entire side of the building. <br />[CFC Appendix D§105.3] <br />• Obstructions: Overhead utility and power lines cannot be located over the aerial fire <br />apparatus access road or between the aerial fire apparatus road and the building. [CFC <br />Appendix D§105.4] <br />• Other Obstructions: Any other or fixed obstruction located on the entire length of the <br />designated aerial fire apparatus access road shall not interfere with the operation of <br />an aerial ladder placed at a maximum climbing angle of 75° from the turntable plane <br />to the fullest extent of the aerial ladder effective reach. [FIRE] <br />