My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso25 16301
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2020-2029
>
2025
>
Reso25 16301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 4:12:53 PM
Creation date
4/29/2025 4:10:01 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Date
4/28/2025
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
4/29/2025 4:12 PM
Modified:
4/29/2025 4:12 PM
Text:
https://library.municode.com/ca/redwood_city/codes/city_code?nodeId=CH20MOVETR_ARTVIISTSTPA
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
4/29/2025 4:12 PM
Modified:
4/29/2025 4:12 PM
Text:
http://www.redwoodcity.org/cds/engineering/standards/design/PartV
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0034/CC RESO APPROVING PROJECT (901 EL CAMINO REAL) – EXHIBIT A <br />REV: 04-22-25 VR <br />Page 21 of 28 <br />shrubs, and groundcover. It shall also verify landscape lighting, fencing, irrigation, <br />and other details as applicable. <br />• Project Architect verifying substantial conformance with the approved elevations, <br />colors, materials, exterior light fixtures, and architectural details. <br /> <br />97. Construction Management and Staging - Prior to building permit issuance, the Applicant <br />submit a construction parking management plan, which shall outline the number of <br />construction workers by phase, phase duration, where parking will be located for each <br />phase. Construction parking, material storage, equipment, or other construction-related <br />uses are not allowed within the City right of way without prior approval from the City <br />Engineer. [COA][ENGINEERING] <br /> <br />98. Lane Closures - Traffic control for lane closures shall conform to the Work Area Traffic <br />Control Handbook. The Applicant shall submit street closures applications of traffic <br />control plans and approval in advance. [SDR][ENGINEERING] <br />99. Public Parking During Construction – Temporary parking meter permits shall be issued <br />prior to removing any public parking spaces from public use during construction. An <br />application fee together with the parking meter fees applicable for the expected duration <br />of the temporary parking meter permit shall be paid in advance prior to issuance of the <br />permit. [SDR][ENGINEERING] <br />100. Winterizing - If construction is not complete by the start of the wet season (October 1 <br />through April 30), the Applicant shall implement a winterization program to minimize the <br />potential for erosion and sedimentation. As appropriate to the site and status of <br />construction, winterization requirements shall include inspecting/maintaining/cleaning <br />all soil erosion and sedimentation controls prior to, during, and immediately after each <br />storm event; stabilizing disturbed soils through temporary or permanent seeding, <br />mulching, matting, tarping or other physical means; rocking unpaved vehicle access to <br />limit dispersion of much onto public right-of-way; and covering/tarping stored <br />construction materials, fuels, and other chemicals. Plans to include proposed measures <br />to prevent erosion and polluted runoff from all site conditions shall be submitted by the <br />Applicant for approval by the Engineering and Transportation Department prior to <br />beginning construction. As site conditions warrant, the City Engineer may direct the <br />Applicant to implement additional winterization requirements. [COA][ENGINEERING] <br />101. Grading – Grading shall be performed in accordance with the City’s Engineering <br />Standards. Soil or other construction materials shall not be stockpiled in the public right- <br />of-way. Submit cut/fill volumes (CY) for all soils to be imported to or exported from the <br />site. [SDR][ENGINEERING] <br />102. Compaction Testing - The Soils Engineer shall conduct compaction testing during <br />trenching and backfill operations at the Applicant’s expense to demonstrate compliance <br />with City Engineering Standards. [SDR][ENGINEERING]
The URL can be used to link to this page
Your browser does not support the video tag.